Rail Coach Factory
- AOC value
- ₹5.73L
- AOC date
- 7 Jan
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 7 Jan 25AOC date
- -Published
- -Closes
- -Bid opens
- 7 Jan 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 07/01/2025
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of End Wall Construction For Vande Bharat Coachesend Wall Construction For Vande Bharat Coaches,End Wall Construction Complete -Npp End For Vande Bharat Dtc Coaches Note:(1)In Drawings Mig Welding (131) Is To Be Read As Tig Welding (141) As Per Design L Etter No. Md46231 Dated 16.03.2024. (2)Firm Shall Collect All Latest/Final Drawings Bef Ore Manufacturing. There May Be Minor Modification In Design To Suit Ralway Requir Ement & Modification To Be Carried Out By Firm At No Further Cost To Railway., As Per Drawing: 89115002 Alt A, Packing Instruction: No Special Packing Required [ Warranty Period: 30 M Onths After The Date Of Delivery ] , End Wall Construction Complete- Npp End For Npp End For Vande Bharat Dtc Coaches Note:(1)In Drawings Mig Welding (131) Is To Be Read As Tig Welding (141) A S Per Design Letter No. Md46231 Dated 16.03.2024. (2)Firm Shall Collect All Latest/Final Drawings Before Manufacturing. There May Be Minor Modification In Design To Suit Ralway Requirement & Modification To Be Carried Out By Firm At No Further Cost To Railway., As Per Drawing: 89415002 Alt A, Packing Instruction: No Special Packing Required [ Warr Anty Period: 30 Months After The Date Of Delivery ] , Set Of End Wall For Mc,Tc,Ndtc & Ndtc Ec For Vande Bharat Coaches Note: (1)In Drawings Mig Welding(131) Is To Be Read As Tig Welding(141) As Per Design Letter No. Md46231 Dated 16.03.2024. (2)Firm Shall Collect All Latest/Final Drawings Before Ma Nufacturing. There May Be Minor Modification In Design To Suit Ralway Requirement & Modification To Be Carried Out By Firm At No Further Cost To Railway., As Per Drawing: Mp24ewmc Version 0, Packing Instruction: No Special Packing Required [ Warranty Period: 30 M Onths After The Date Of Delivery ] , Set Of End Wall For Ndtc/Ec2 For Vande Bharat Coaches Note:(1)In Drawin Gs Mig Welding (131) Is To Be Read As Tig Welding (141) As Per Design Letter No. Md4623 1 Dated 16.03.2024. (2)Firm Shall Collect All Latest/Final Drawings Bef. Last date of submission for this tender is 2024-08-05. This is a Wall construction tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free