Rail Coach Factory
- AOC value
- ₹2.48Cr
- AOC date
- 17 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 17 Oct 24AOC date
- -Published
- -Closes
- -Bid opens
- 17 Oct 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 17/10/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Arrangements Of Stiffner Of Two Types.Arrangements Of Stiffner Of Two Types.,Arrangement Of Stiffner, As Per Drawing: Col Ii Of Emu/M/3Ph/Hl 7-6-006, Packing I Nstruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub Du Ring Transportation. The Item Should Be Packed With Adequate Strength. Transit Da Mage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Deli Very ] ] , Arrangements Of Stiffner In Train18 Coaches, As Per Drawing: Train18/Mc/Ac 7- 6-005, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After T He Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2024-09-30. This is a Railway Ancillaries tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free