Rail Coach Factory
- AOC value
- ₹20.7L
- AOC date
- 4 Feb
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 4 Feb 25AOC date
- -Published
- -Closes
- -Bid opens
- 4 Feb 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 04/02/2025
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Set Of Ermeto Fittings For Plumbingset Of Ermeto Fittings For Plumbing,Set Of Ermeto Fittings For Plumbing Of Lhb Buffet Coaches., As Per Drawing: M Plefbuplubfur Version 3, Packing Instruction: Set Of Ermeto Fittings:- Each Item Of The Set S Hould Be Packed Individually After Covering The Threaded Portion With Suitable Cap To Prevent Thread Damange In Bio-Degradeable Polythene Packet Invariably Clearly Mentioned The Part No. Of The Item On It. All The Items Of Set Then Collectivelly Packed I N Card Board Box Of Sufficent Strength, Further Tied With Suitable No. Of Nylon Strips. A Well Protected List Should Be Pasted On Each Box Bearing Purchase Order No, Pl No., Description, Drg./Spec./Part No., Qty., Firms Name & Address, Date Of Despatch Etc. The T Ransit Damange If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After T He Date Of Delivery ] ] , Set Of Ermeto Fittings For Plumbing Of Lhb Coaches., As Per Drawing: Mplefpl Ublhb Version 4, Packing Instruction: Set Of Ermeto Fittings:- Each Item Of The Set Should B E Packed Individually After Covering The Threaded Portion With Suitable Cap To Prevent Thread Damange In Bio-Degradeable Polythene Packet Invariably Clearly Mentioned The Part No. Of The Item On It. All The Items Of Set Then Collectivelly Packed In Card Board B Ox Of Sufficent Strength, Further Tied With Suitable No. Of Nylon Strips. A Well Protect Ed List Should Be Pasted On Each Box Bearing Purchase Order No, Pl No., Description, Dr G./Spec./Part No., Qty., Firms Name & Address, Date Of Despatch Etc. The Transit Damange If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2025-01-14. This is a Railway Ancillaries tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free