Rail Coach Factory
- AOC value
- ₹36.11L
- AOC date
- 13 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 13 Mar 25AOC date
- -Published
- -Closes
- -Bid opens
- 13 Mar 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 13/03/2025
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Cab Air Conditioning Unit(2.0 Tr Min. In Each Dmc)Cab Air Conditioning Unit(2.0 Tr Min. In Each Dmc),Cab Air Conditioning Unit(2.0 Tr Min. In Each Dmc)With Control Panel Along With Mounting Frame & Anchoring Arrangement To Coach Body With All Accessories ., As Per Drawing: Icf/Elec/110,Cs-1&2 With Rcf Annx.A., Packing Instruction: As Per Standard Pac King. It Should Be Ensured That Item Should Not Rub During Transportation. The Ite M Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2024-09-24. This is a Railway Ancillaries tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free