Rail Coach Factory
- AOC value
- ₹8.2Cr
- AOC date
- 12 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 12 Nov 24AOC date
- -Published
- -Closes
- -Bid opens
- 12 Nov 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 12/11/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Supply , Installation, Commissioningsupply , Installation, Commissioning,Supply , Installation, Commissioning & Testing Of Stainless Steel Tubes An D Double Ferrule Fittings For Lslrd Coaches, As Per Drawing: Material Schedule As Per Set List No. Rcf/Md/Mat Sch/Lslrd, Ver 00., Packing Instruction: No Special Packing Required . The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Pr Otected With Suitable Covering To Prevent It From Damage. However Transit Damag E If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply,Installation,Commissioning & Testing Of Stainless Steel Tubes And Double Ferrule Fittings For Lhb Hot Buffet Car & Amrit Bharat Lcbnacab Coaches, As Per Drawing: Rcf/Md/Mat Sch/Lwcbac , Ver-00 , Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Shoul D Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply , Installation, Commissioning & Testing Of Stainless Steel Tubes An D Double Ferrule Fittings For Lgs Coaches., As Per Drawing: Material Schedule As Per S Et List No. Rcf/Md/Mat Sch/Lgs, Ver 00., Packing Instruction: No Special Packing Required. Th E Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Prote Cted With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply , Installation, Commissioning & Testing Of Stainless Steel Tubes An D Double Ferrule Fittings For Lhb Scn Coaches., As Per Drawing: Material Schedule As P Er Set List No. Rcf/Md/Mat Sch/Lwscn, Ver 00., Packing Instruction: No Special Packing Requi Red. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent I. Last date of submission for this tender is 2024-09-24. This is a Absorbents tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free