Rail Coach Factory
- AOC value
- ₹7.26Cr
- AOC date
- 23 Jul
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 23 Jul 24AOC date
- -Published
- -Closes
- -Bid opens
- 23 Jul 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 23/07/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Frp Modular Toilet (Pre Assembled) For Lhb Gs Coaches/Frp Modular Toilet (Pre Assembled) For Lhb Gs Coaches/,Frp Modular Toilet For Lhb Gs Coaches. Follow Colour Shade As Per Lno. Md46271 Dated 18.01.2021., As Per Drawing: Mdts-214 Rev-12 (All Items Of Pipe Laying For Wate R In Lavatory To Drg. No. Ls63100 And Lg63128 Are To Be Supplied Lo0se). [ Warranty Period: 84 Months After The Date Of Delivery ] , Frp Modular Toilet For Lhb Scn Coaches. Follow Colour Shade As Per Lno . Md46271 Dated 18.01.2021., As Per Drawing: Mdts-214 Rev-12 (All Items Of Pipe Laying For Wat Er In Lavatory To Drg. No. Le63157 And Le63160 Are To Be Supplied Lo0se). [ Warranty Period : 84 Months After The Date Of Delivery ] Page 1 Of 5 Run Date/Time: 24/06/2024 17:25:52Stores/Hsq/Rcf Tender Document => Limited. Last date of submission for this tender is 2024-06-28. This is a Railway Ancillaries tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free