🎉 Your free trial plan has started. Plan will expire in 0 days

Rail Coach Factory

kapurthala, punjab

AOC value
₹30.36L
AOC date
11 Oct
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 11 Oct 24AOC date

Important info

Result ID
Refer Docs
Award of contract
11/10/2024
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Rail Coach Factory has published Supply Of End Wall Assembly For Lhb Amrit Bharat Coachesend Wall Assembly For Lhb Amrit Bharat Coaches,End Wall Assembly For Lhb Gs & Scn (Amrit Bharat ) Coaches Note:-(1)In Dra Wings Mig Welding (131) Is To Be Read As Tig Welding (141) As Per Design Letter No. Md4 6231 Dated 16.03.2024. (2)Firm Shall Collect All Latest/Final Drawings Before Manufact Uring. There May Be Minor Modification In Design To Suit Ralway Requirement & Modif Ication To Be Carried Out By Firm At No Further Cost To Railway., As Per Drawing: 7541500 1 Alt. Nil, Packing Instruction: 1. The Supplier Shall Pack The End Wall In A Suitably Designed Returnable Fixture In Such A Way That End Wall Shall Not Get Scratched, Damaged, T Wisted During Transportation, Storage And Lifting And To Avoid Scratches On Oute R Surface. It Should Be Seperated By Suitable Environment Friendly Blocks To Avaoi D Rubbing Of Two Endwall Surfaces . It Should Have Standard Clamping /Fastening M Echanism So That It Can Be Opened Easily. It Should Have Firms Identification Mark. 2. First Returanable Fixture Along With End Wall Be Retained By Rcf & This Fixture Shal L Be Exchanged In The Second Lot Supply And So On. At The End Of The Contact, The Fi Rm Shall Collect The Remaining Returnable Packing Fixture From Rcf. 3. The Packing Fixture/Frame To Be Fabricated Having Sufficient Strenght To Bear Approximate 2 To Nne Load In Static & Moving Condition Of Two Coach Sets Of End Wall. 4. The Fixture /F Rame/Pallet Should Be Designed So That The Packed End Wall Preferably Remain In V Ertical Position To Minimize Surface Area. 5. It Should Also Be Suitable For Storage Of End Wallunder Open Sky. [ Warranty Period: 30 Months After The Date Of Delivery ] , Set Of End Wall Assly For Lhb Slrd Amrit Bharat Coaches. Note:-(1)In Drawi Ngs Mig Welding (131) Is To Be Read As Tig Welding (141) As Per Design Letter No. Md462 31 Dated 16.03.2024. (2)Firm Shall Collect All Latest/Final Drawings Before Manufactur Ing. There May Be Minor Modifi. Last date of submission for this tender is 2024-07-18. This is a Railway Ancillaries tender in kapurthala, Punjab

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in