Rail Coach Factory
- AOC value
- ₹1.02Cr
- AOC date
- 17 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 17 Oct 24AOC date
- -Published
- -Closes
- -Bid opens
- 17 Oct 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 17/10/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Stainless Steel Tubes And Double Ferrulestainless Steel Tubes And Double Ferrule,Stainless Steel Tubes And Double Ferrule Fittings For Lslrd Coaches, As P Er Drawing: Material Schedule No. Icf/Sk-10-2-671, Issue Status-01, Rev-01, Cs-01 And As Per Specification No. Icf/Md/Spec-166, Issue Status-01,Rev-04, Amd-01 & Amd​02. [ Warranty Period : 30 Months After The Date Of Delivery ] ] , Supply,Installation,Commissioning & Testing Of Stainless Steel Tubes And Double Ferrule Fittings For Lhb Hot Buffet Car & Amrit Bharat Lcbnacab Coaches, As Per Drawing: Rcf/Md/Mat Sch/Lwcbac , Ver-00 , Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Shoul D Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Stainless Steel Tubes And Double Ferrule Fittings For Lgs (Lhb-Eog-Gs) Co Aches., As Per Drawing: Icf/Sk-10-2-634, Issue Status-01,Rev-01,Cs-01 & Cs-02 As Per Icf Specifi Cation No. Icf/Md/Spec-166,Issue Status-01,Rev-04, Amd-01 & Amd-02., Packing Instruction: As Pe R Standard Packing. It Should Be Ensured That Item Should Not Rub During Transpo Rtation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Stainless Steel Tubes And Double Ferrule Fittings For Lhb Coach, As Per Dra Wing: Material Schedule No. Icf/Sk-10-2-632,Issue Status-01,Rev-01,Cs-01,Cs-02,Cs-03,Cs0​ 4 & Cs-05 And As Per Icf Specification No.Icf/Md/Spec-166,Issue Status-01,Rev-04,Amd-01 & Am D-02, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After T He Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2024-09-19. This is a Steel Tube tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free