Rail Coach Factory
Important Info
AOC Description
Rail Coach Factory has published Supply Of Set Of Cab Door Assembly Lh & Rh For 3Ph Memu / Dmc Coaches Note:- Finished Component Shall Be Throughly Cleaned And Applied With One Coat Of Eco Friendly Water Based Epoxy Zinc Phosphate Etch Primer ( Airless Spray ) To Icf / Md / Spec-231 To A Dft Of 15 To 20 Microns., As Per Drawing: Mpcd3phm Version 0, Packing Instruction: Lhb Doors : All Types Of Doors Of Lhb Type Of Coaches To Be Wrapped In 1 Mm Thick Polythene Sheet And To Be Packed In Wooden Box Made Of Planks Of Minimum 20 Mm Thickness. The Wooden Boxes To Be Strengthened Along The Length At Four Places With Wooden Strips Of 40X100mm Suitable Length All Around The Box. [ Warranty Period: 30 Months After The Date Of Delivery ] . Last date of submission for this tender is 2023-09-25. This is a Other Adhesives And Sealants tender in Kapurthala, Punjab
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

