Rail Coach Factory
- AOC value
- ₹7.06L
- AOC date
- 13 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 13 Dec 24AOC date
- -Published
- -Closes
- -Bid opens
- 13 Dec 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 13/12/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Retention Tank (Four Types)Retention Tank (Four Types),Retention Tank For Lhb Slr Compatible With Vacuum Evacuation System, As Per Drawing: Mi007539 Alt Nil And Mdts 26001 Rev-04. Follow Letter No Md22301 Dated 01/10/2 018, Installation And Commissioning Is Inclusive, Packing Instruction No. Pi100 Ver1.0 : No Spe Cial Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items E Tc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. Ho Wever Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Month S After The Date Of Delivery ] , Retention Tank For Lhb Power Car Compatible With Vacuum Evacuation Sy Stem, As Per Drawing: Mi006418 Alt C And Mdts 26001 Rev 04 Is Applicalbe. Follow Letter No Md22301 Dated 01/10/2018, Installation And Commissioning Is Inclusive, Packing Instruction No . Pi100 Ver1.0: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warra Nty Period: 30 Months After The Date Of Delivery ] , Retention Tank Lh For Lhb Coaches Compatible With Vacuum Evacuation Sy Stem, As Per Drawing: Mi005711, Mdts 26001 Rev 04 Is Applicalbe And Follow Letter No Md223 01 Dated 01/10/2018, Installation And Commissioning Is Inclusive, Packing Instruction No. Pi100 Ver1.0: No Special Packing Required. The Protruding, Threaded Portion, Gauges And L Oose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It Fro M Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] , Retention Tank Rh For Lhb Coaches Compatible With Vacuum Evacuation S Ystem, As Per Drawing: Mi005710 Alt M, Mdts 26001 Rev 04 Is Applicalbe And Follow Letter N O Md22301 Dated 01/10/2018, Installation And Commissioning Is Inclusive, Packing Instruction No. Pi10. Last date of submission for this tender is 2024-07-09. This is a Railway Ancillaries tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free