🎉 Your free trial plan has started. Plan will expire in 0 days

Rail Coach Factory

kapurthala, punjab

AOC value
₹17.12Cr
AOC date
22 Mar
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 22 Mar 25AOC date

Important info

Result ID
Refer Docs
Award of contract
22/03/2025
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Rail Coach Factory has published Supply Of Underframe Completeunderframe Complete,Under Frame Complete For Lhb Gs(Eog) Coaches Note:-(1)Crf Items Are To Bema Nufactured As Per Dy. Cpleiii Letter No.Rcf/Hsq/Plg/Mpsh/510003/Lhb Dated 04/04/2024. (2) Prote Ction Procedure As Per Dy Cple-Iii Annexure-App Dated 14/05/2024. , As Per Drawing: Lg11265 Alti & As Per Schedule Of Technical Requirement Specification No. Mdts21320 Rev-02 Dat Ed 09.06.2020 & Masking As Per Drg. No. Mi007679 Alt.Nil Note: 1. Supporting Member On T Rough Floor Will Be Applicable As Per Drg.No. Mi006839 Altc., Packing Instruction: Packing As P Er Standard Packing [ Warranty Period: 84 Months After The Date Of Delivery ] ] , Under Frame Complete For Lhb Slr Coaches Note:-(1)Crf Items Are To Bemanufac Tured As Per Dy. Cpleiiiletter No. Rcf/Hsq/Plg/Mpsh/510003/Lhbdated 04/04/2024. (2) Protection Procedure Asper Dy Cple-Iii Annexure-App Dated 14/05/2024. , As Per Drawing: Lr11873 Alt.Nil Schedule Of Technical Requirement Specification No. Mdts21320 Rev-02 & Masking As Per Drg No Mi007679 Alt. Nil Note: Brackets To Drg No Lr36611 Alt. A(Qpc=1 Nos.) & Lr36612 A Lt. C(Qpc=1 Nos.) Are To Be Supplied As Loose Items., Packing Instruction: Packing As Per Sta Ndard Packing [ Warranty Period: 84 Months After The Date Of Delivery ] ] , Underframe Complete For Lhb Scn Amrit Bharat Coaches Note:-(1)Firm Shall Collect All Latest/Final Drawings Before Manufacturing. There May Be Minor Modificati On In Design To Suit Railway Requirement & Modification To Be Carried Out By Firm At No Further Cost To Railway. (2)Special Condition As Per Annexure-Abc Dy Cple-Iii Letter No. R Cf/Hsq/Plg/Mpsh/510003 Dated 27/05/2024., As Per Drawing: Ls11256 Alt. A, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transp Ortation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , S Hall Be At The Cost Of Supplier. [ Warranty Period: 84 Months After The Date Of Delivery ] ] , Underframe Complete Fo. Last date of submission for this tender is 2025-01-03. This is a Railway Ancillaries tender in kapurthala, Punjab

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in