Rail Coach Factory
- AOC value
- ₹7.89L
- AOC date
- 24 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 24 Oct 24AOC date
- -Published
- -Closes
- -Bid opens
- 24 Oct 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 24/10/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Switch Plate Assemblies For Various Types Of Lhb Coaches, Switch Plate Assemblies For Lhb Eog Ac 3-Tier / Humsafar Coaches, As Per Dr Awing: Edml064, Rev-B, Am-4, Corr-1, Table-1B., Packing Instruction: Packing As Per Drawing [ Warr Anty Period: 30 Months After The Date Of Delivery ] , Switch Plate Assembly Complete For Lhb Eog / Sg Ac 2-Tier Coaches, As Per Dr Awing: Edml064, Rev-B, Am-4, Table-1A, Corr-1, Packing Instruction: As Per Standard Packing. It S Hould Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of S Upplier. [ Warranty Period: 30 Months After The Date Of Delivery ] , Switch Plate Assembly Complete With Polycarbonate Cover Frame & Powd Er Coated Steel Plate., As Per Drawing: Edml064, Rev-B, Am-4, Table-8., Packing Instruction: Packin G As Per Drawing [ Warranty Period: 30 Months After The Date Of Delivery ] , Switch Plate Assembly Along With Mobile Charging Socket For Lhb Scn Co Aches ( For Wider Window Scn ) , As Per Drawing: Edml156, Rev-2 ( 1 Set Comprising Item-1 ( 10 N Os ) , Item-2 ( 10Nos ) Item-3 ( 10 Nos ) , Packing Instruction: Packing As Per Drawing [ Warranty Period : 30 Months After The Date Of Delivery ] , Switch Plate Assembly Along With Mobile Charging Socket For Antyodya Coaches., As Per Drawing: Edml086, Rev-8, Table-2 ( 1Set Comprising Of 30 Switch Plates ) Ite M-1 ( 10 Nos ) , Item-2 ( 10Nos ) , Item-3 ( 10Nos ) , Packing Instruction: Packing As Per Drawing [ Warrant Y Period: 30 Months After The Date Of Delivery ] , Switch Plate Assembly Compplete Alongwith With Mobile Charging Socket For Lhb Non Ac Chair Car ( Lwscz ) Coaches., As Per Drawing: Edml125, Rev-6, Table-1 ( 1 Set Co Mprising Of Item-1=18 Nos & Item-3=18 Nos ) , Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Shoul D Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] . Last date of submission for this tender is 2024-05-10. This is a Switch Supply tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free