Rail Coach Factory
- AOC value
- ₹55.04L
- AOC date
- 21 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 21 Aug 24AOC date
- -Published
- -Closes
- -Bid opens
- 21 Aug 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 21/08/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Supply Of Stainless Steel Tubes And Doublesupply Of Stainless Steel Tubes And Double,Supply Of Stainless Steel Tubes And Double Ferrule Fittings For 3 Phase Memu/Tc Coaches As Per Rcf Document No. Mp23fit/3Ph/Bom/002 Layout Drg. No. Et36293 Confining To Icf/Md/Spec-166 Issue Status-01 Rev.-04, As Per Drawing: Mp23fit/3Ph/Bom/002 Issue Status 00, Ver.0.0 Dtd 07/08/2023., Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] , Supply Of Stainless Steel Tubes And Double Ferrule Fittings For 3 Phase Memu/Dmc Coaches As Per Rcf Layout Drg No. Em36400 &. Last date of submission for this tender is 2024-03-27. This is a Railway Ancillaries tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free