Rail Coach Factory
- AOC value
- ₹45.58L
- AOC date
- 9 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 9 Oct 24AOC date
- -Published
- -Closes
- -Bid opens
- 9 Oct 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 09/10/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Trough Floor Assembly Complete For 3 Phase Memu/Dmc Coachtrough Floor Assembly Complete For 3 Phase Memu/Dmc Coach,Trough Floor Assembly Complete For 3 Phase Memu/Dmc Coach Note:- 1.0 E Xtra Channels Are To Be Provided On Suitable Location Of Trough Floor Assembly F Or Lifting/Transporation Purpose ., As Per Drawing: Em11545 Altb Item No. 6 To Be Supplie D As Loose In Seprate Packing, Packing Instruction: No Special Packing Required. The Prot Ruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected Wi Th Suitable Covering To Prevent It From Damage. However Transit Damage If Any Sha Ll Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ]. Last date of submission for this tender is 2024-08-22. This is a Railway Ancillaries tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free