Rail Coach Factory
- AOC value
- ₹4.6L
- AOC date
- 21 Jun
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 21 Jun 24AOC date
- -Published
- -Closes
- -Bid opens
- 21 Jun 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 21/06/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Clamp (2Pipe 20Mm) & Pipe Clamp For 25 Mm Boreclamp (2Pipe 20Mm) & Pipe Clamp For 25 Mm Bore,Pipe Clamp For 25 Mm Bore, As Per Drawing: Cc35326 Alt C, Packing Instruction: Suitab Ly Packed In Jute Bags, Proction Procedure: Wi100100, Quality Plan: N.A. [ Warranty Period: 30 Months After The Date Of Delivery ] , Clamp (2Pipe 20Mm), As Per Drawing: T-7-1-754 Item-4 Altd, Packing Instruction: Suitabl Y Packed In Jute Bags, Proction Procedure: Wi100100, Quality Plan: N.A. [ Warranty Period: 30 Months A Fter The Date Of Delivery ] => Limited. Last date of submission for this tender is 2024-06-17. This is a Bags Supply tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free