Rail Coach Factory
- AOC value
- ₹12.37L
- AOC date
- 9 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 9 Mar 23AOC date
- -Published
- -Closes
- -Bid opens
- 9 Mar 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 09/03/2023
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Set Of Frp Panels For Flat Ceiling For Standees And Lavatory Area For Memu / Tc 3Phase Medha Coachesset Of Frp Panels For Flat Ceiling For Standees And Lavatory Area For Memu / Tc 3Phase Medha Coaches, Set Of Frp Panels For Flat Ceiling For Standees And Lavatory Area For Memu / Tc 3Phase Medha Coaches And Colour Shade Ral-9001 As Per Lno. Md22151 Dt 18 / 6 / 2019., As Per Drawing: Et44153 Alt B Item 2 To 4 And 18 To 20. As Per Design Office L.No. Md21896 Dated 03 / 10 / 2022 Mdts-133 Rev. 05 Is Applicable In Lieu Of Icf / Md / Spec-167A Mentioned In The Drawings. [ Warranty Period: 30 Months After The Date Of Delivery ] => Limited. Last date of submission for this tender is 2023-02-23. This is a Railway Ancillaries tender in Ludhiana, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free