Rail Coach Factory
- AOC value
- ₹7.66Cr
- AOC date
- 11 Apr
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 11 Apr 25AOC date
- -Published
- -Closes
- -Bid opens
- 11 Apr 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 11/04/2025
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Set Of Side Wall Complete And Roof Completeset Of Side Wall Complete And Roof Complete,Set Of Side Wall Complete & Roof Complete For Lhb Gs Amrit Bharat Coaches Note:-(1)Firm Shall Collect All Latest/Final Drawings Before Manufacturing. There May Be Minor Modification In Design To Suit Railway Requirement & Modification To Be Carrie D Out By Firm At No Further Cost To Railway. (2)Special Condition As Per Annexure-Abc D Y Cple-Iii Letter No. Rcf/Hsq/Plg/Mpsh/510003 Dated 27/05/2024., As Per Drawing: Mp24lwsabs Wr Version 2 [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Set Of Side Wall Complete & Roof Complete For Lhb Scn Amrit Bharat Coache S Note:-(1)Firm Shall Collect All Latest/Final Drawings Before Manufacturing. There Ma Y Be Minor Modification In Design To Suit Railway Requirement & Modification To Be Carried Out By Firm At No Further Cost To Railway. (2)Special Condition As Per Annexure-Abc Dy Cple-Iii Letter No. Rcf/Hsq/Plg/Mpsh/510003 Dated 27/05/2024., As Per Drawi Ng: Mp24lwscnabswr Version 3 [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Set Of Side Wall Complete And Roof Complete For Lhb Slrd Amrit Bharat Coa Ches Note:-(1)Firm Shall Collect All Latest/Final Drawings Before Manufacturing. There May Be Minor Modification In Design To Suit Railway Requirement & Modification To Be Ca Rried Out By Firm At No Further Cost To Railway. (2)Special Condition As Per Annexure- Abc Dy Cple-Iii Letter No. Rcf/Hsq/Plg/Mpsh/510003 Dated 27/05/2024., As Per Drawing: Mp24ls Lrdabswr Version 1 [ Warranty Period: 30 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2025-02-18. This is a Railway Ancillaries tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free