Rail Coach Factory
- AOC value
- ₹5.02L
- AOC date
- 17 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 17 Oct 24AOC date
- -Published
- -Closes
- -Bid opens
- 17 Oct 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 17/10/2024
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Fan Bracketfan Bracket,Fan Bracket, As Per Drawing: Lg16251 Alt. Nil, Packing Instruction: No Special Pac King Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Da Mage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of D Elivery ] ] => Limited. Last date of submission for this tender is 2024-10-16. This is a Brackets and Braces tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free