Rail Coach Factory
- AOC value
- ₹3.97Cr
- AOC date
- 7 Jan
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 7 Jan 25AOC date
- -Published
- -Closes
- -Bid opens
- 7 Jan 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 07/01/2025
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of Set Of Euro Bowl And Electro-Pneumatic Pressurised Flushing System For Lhb Coaches And Set Of Lavatory Pan And Electro-Pneumatic Pressurised Flushing System For Lhb Coachesset Of Euro Bowl And Electro-Pneumatic Pressurised Flushing System For Lhb Coaches And Set Of Lavatory Pan And Electro-Pneumatic Pressurised Flushing System For Lhb Coaches,Set Of Euro Bowl And Electro-Pneumatic Pressurised Flushing System Fo R Lhb Coaches., As Per Drawing: Mplebeplhb Version : 0 [ Warranty Period: 30 Months After The Date Of Delivery ] , Set Of Lavatory Pan And Electro-Pneumatic Pressurised Flushing System For Lhb Coaches., As Per Drawing: Mplpeplhb Version : 1 [ Warranty Period: 30 Months After The Dat E Of Delivery ] Page 1 Of 6 Run Date/Time: 19/06/2024 16:00:08Stores/Hsq/Rcf Tender Document. Last date of submission for this tender is 2024-07-19. This is a Railway Ancillaries tender in kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free