🎉 Your free trial plan has started. Plan will expire in 0 days

Military Engineer Services

ge (af) pathankot, punjab

AOC value
₹20.99L
AOC date
18 May
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 18 May 21AOC date

Important info

Result ID
Refer Docs
Award of contract
18/05/2021
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Military Engineer Services has published Manning And Operation For Certain Ac Installation At Wsa Iii Area At Afs Pathankot , Outsourcing Of Services For Air Conditioning Plant Of Capacity 3X12 . 5 Tr At Location Ac-I ( Was Iii ) ( To Be Operated By Same Operator ) By Providing Three Refg Mech/Skilled Operators For Round The Clock Operation In Three Shifts Each Shift Of 8 Hours Per Day Including Sunday And Holiday To Maintain Desired Air Temprature And Humidity Inside Premises Including Checking Of All Parameters Of Ac Plant , Hot Water Generator , Etc And All Process Required For Smooth Functioning Including Maintaining Running/Events Record In Specified Log Sheet Per Day To Be Provided By Contractor For Ac Plant , The Surrounding Area Of Ac Plant Installation Including Cooling Tower Shall Be Cleared Of Vegetation & Undergrowth Throughout Of Contract Including Daily Cleaning Of Eqpt/Installation Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above But For Location Ac-Ii ( Wsa Iii ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above But For Location Ac-Iii ( Wsa Iii ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above Here-In- Before But For Location Adm Block ( Wsa Iii ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above Here-In- Before But For Location Matra ( Wsa Iii ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above Here-In- Before But For Location Nbd ( Wsa Iv ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , Outsourcing Of Services For Air Conditioning Plant Of Capacity 3X12 . 5 Tr , And Dg Set 82 . 5 Kva At Location 01 End ( To Be Operated By Same Operator ) By Providing Three Refg Mech/Skilled Operators For Round The Clock Operation In Three Shifts Each Shift Of 8 Hours Per Day Including Sunday And Holiday To Maintain Desired Air Temprature And Humidity Inside Premises Including Checking Of All Parameters Of Dg Set And Ac Plant , Oil Level , Filling Of Lub Oil , Coolant And Diesel In Dg Set Etc And All Process Required For Smooth Functioning Including Maintaining Running/Events Record In Specified Log Sheet Per Day To Be Provided By Contractor For Ac Plant And Dg Set , The Surrounding Area Of Dg Sets Installation Including Cooling Tower Shall Be Cleared Of Vegetation & Undergrowth Throughout Of Contract Including Daily Cleaning Of Eqpt/Installation Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -7 Above But For Location 19 End Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , Note For All Above Items No 1 To 8 :- 1 . Previous Contract Aggrement No Ceafu-24/2017-18-Complection Date Of Each Ac Plant Out Sourcing Date Are As Per Given Below :- ( A ) Sr No . 1 For Ac-I ( Wsa Iii ) - 18 May 2021 . ( B ) Sr No . 2 For Ac-Ii ( Wsa Iii ) - 23 Jun 2021 . ( C ) Sr No . 3 For Ac-Iii ( Wsa Iii ) - 01 Jun 202 . ( D ) Sr No . 4 For Adm Block ( Wsa Iii ) - 20 Sep 2021 . ( E ) Sr No . 5 For Matra ( Wsa Iii ) - 16 Jul 2021 . ( F ) Sr No . 6 For Nbd ( Wsa Iv ) - 25 Jul 2021 . ( G ) Sr No . 7 For 01 End - 29 Oct 2021 . ( H ) Sr No . 8 For 19 End - 29 Oct 2021 . Hence Commencement Date Of Above Ac Plant Installations Should Be Stated After Completion Date Of Above Mention Ca Please . 2 . A Penal Recovery Of @ Rs 500/- Per Shift Per Operator Shall Be Recovered In Case Of Operator Found Absent From Duty . 3 . Operator Will Not Leave The Installation Without Proper Handing Taking With The Next Shift Operator . 4 . Cost Of Reliever Is Deemed To Be Included In Above Quoted Rates . 5 . Operator Will Have Knowledge Of Operation Of Equipments Installed At Location Deployed. Last date of submission for this tender is 2021-05-15. This is a Clocks tender in Ge (af) Pathankot, Punjab

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in