Military Engineer Services
- AOC value
- ₹20.99L
- AOC date
- 18 May
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 18 May 21AOC date
- -Published
- -Closes
- -Bid opens
- 18 May 2021AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 18/05/2021
- Authority
- Military Engineer Services
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Military Engineer Services has published Manning And Operation For Certain Ac Installation At Wsa Iii Area At Afs Pathankot , Outsourcing Of Services For Air Conditioning Plant Of Capacity 3X12 . 5 Tr At Location Ac-I ( Was Iii ) ( To Be Operated By Same Operator ) By Providing Three Refg Mech/Skilled Operators For Round The Clock Operation In Three Shifts Each Shift Of 8 Hours Per Day Including Sunday And Holiday To Maintain Desired Air Temprature And Humidity Inside Premises Including Checking Of All Parameters Of Ac Plant , Hot Water Generator , Etc And All Process Required For Smooth Functioning Including Maintaining Running/Events Record In Specified Log Sheet Per Day To Be Provided By Contractor For Ac Plant , The Surrounding Area Of Ac Plant Installation Including Cooling Tower Shall Be Cleared Of Vegetation & Undergrowth Throughout Of Contract Including Daily Cleaning Of Eqpt/Installation Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above But For Location Ac-Ii ( Wsa Iii ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above But For Location Ac-Iii ( Wsa Iii ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above Here-In- Before But For Location Adm Block ( Wsa Iii ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above Here-In- Before But For Location Matra ( Wsa Iii ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -1 Above Here-In- Before But For Location Nbd ( Wsa Iv ) Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , Outsourcing Of Services For Air Conditioning Plant Of Capacity 3X12 . 5 Tr , And Dg Set 82 . 5 Kva At Location 01 End ( To Be Operated By Same Operator ) By Providing Three Refg Mech/Skilled Operators For Round The Clock Operation In Three Shifts Each Shift Of 8 Hours Per Day Including Sunday And Holiday To Maintain Desired Air Temprature And Humidity Inside Premises Including Checking Of All Parameters Of Dg Set And Ac Plant , Oil Level , Filling Of Lub Oil , Coolant And Diesel In Dg Set Etc And All Process Required For Smooth Functioning Including Maintaining Running/Events Record In Specified Log Sheet Per Day To Be Provided By Contractor For Ac Plant And Dg Set , The Surrounding Area Of Dg Sets Installation Including Cooling Tower Shall Be Cleared Of Vegetation & Undergrowth Throughout Of Contract Including Daily Cleaning Of Eqpt/Installation Complete All As Specified And Directed By Engineer-In-Charge , All As Per Item No -7 Above But For Location 19 End Comprising Of All Connected Accessories Complete All As Specified And Directed By Engineer-In-Charge , Note For All Above Items No 1 To 8 :- 1 . Previous Contract Aggrement No Ceafu-24/2017-18-Complection Date Of Each Ac Plant Out Sourcing Date Are As Per Given Below :- ( A ) Sr No . 1 For Ac-I ( Wsa Iii ) - 18 May 2021 . ( B ) Sr No . 2 For Ac-Ii ( Wsa Iii ) - 23 Jun 2021 . ( C ) Sr No . 3 For Ac-Iii ( Wsa Iii ) - 01 Jun 202 . ( D ) Sr No . 4 For Adm Block ( Wsa Iii ) - 20 Sep 2021 . ( E ) Sr No . 5 For Matra ( Wsa Iii ) - 16 Jul 2021 . ( F ) Sr No . 6 For Nbd ( Wsa Iv ) - 25 Jul 2021 . ( G ) Sr No . 7 For 01 End - 29 Oct 2021 . ( H ) Sr No . 8 For 19 End - 29 Oct 2021 . Hence Commencement Date Of Above Ac Plant Installations Should Be Stated After Completion Date Of Above Mention Ca Please . 2 . A Penal Recovery Of @ Rs 500/- Per Shift Per Operator Shall Be Recovered In Case Of Operator Found Absent From Duty . 3 . Operator Will Not Leave The Installation Without Proper Handing Taking With The Next Shift Operator . 4 . Cost Of Reliever Is Deemed To Be Included In Above Quoted Rates . 5 . Operator Will Have Knowledge Of Operation Of Equipments Installed At Location Deployed. Last date of submission for this tender is 2021-05-15. This is a Clocks tender in Ge (af) Pathankot, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free