South Eastern Railways
Important Info
AOC Description
South Eastern Railways has published Supply Of transformer lifting/lowering trolley , fabrication, supply, testing and commissioning of transformer lifting/lowering trolley for wag -9/wap-7 locomotives.(note: gantry and winch sets are not required) lifting capacity=12 ton, no of manu al/lever operated hydraulic jacks = 04 each having individual valves for synchronized operation. no of whe els for movement =04 wheel diameter = 36 to 40 cm transformer lifting platform size = 4 ft x 9 ft overall dimension of lifting trolley = length (14 to 15 ft) x width 4ft height of lifting platform in ideal condition (fro m ground) = 68 to 70 cm. height of lifting platform in lifted condition (from ground) = 70 cm to 100 /105 c m. before fabrication/supply drawing is to be approved by consignee. [ warranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-08-17. This is a Transformer Supply tender in null, Odisha
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

