National Aluminium Company Limited
- AOC value
- ₹35.9L
- AOC date
- 16 Feb
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 16 Feb 21AOC date
- -Published
- -Closes
- -Bid opens
- 16 Feb 2021AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 16/02/2021
- Authority
- National Aluminium Company Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
National Aluminium Company Limited has published Construction Of Rcc Road From 90 Degree Bend To Watch Tower-03 , Clearing Jungle Including Uprooting Of Rank Vegetation , Grass , Brush Wood , Trees And Saplings Of Girth Up To 30 Cm Measured At A Height Of 1 M Above Ground Level And Removal Of Rubbish Up To A Distance Of 50 M Outside The Periphery Of The Area Cleared Complete As Per Direction Of Manager In Charge . , Earthwork In Excavation In All Kinds Of Soil In Trenches For Foundation , Pipes And For Drainage Of Water / Rain Water Etc , Including Dressing The Sides And Ramming Of Bottom , Lift Upto 1 . 5Mtr Including Getting Out And Stacking The Excavated Soil And Disposal Of Surplus Excavated Soil Within A Lead Of 100 M As Per Direction Of The Manager In Charge . , Preparation Of Subgrade By Excavating Earth To An Average Of 22 . 5Cm Depth Including Dressing And Cambering Etc Including Compacting Of Subgrade With Power Road Roller Including Making Good The Undulations Etc Transporting & Disposal Of Surplus Earth Within A Lead Up To 100 Mtr Complete As Per Instruction Of The Manager-In-Charge . , Providing & Lying Of Granite Stone Boulder Of Maximum 225Mm Size For Boulder Soling And Filling The Interstices With Nalco Issued Fly Ash / Bottom Ash / Pond Ash Including Cutting , Loading , Unloading , Trasporting , Segregating , Laying , Placing With Spells , Preparing The Surface , Watering , Compacting With Necessary Number Of Passes Using Power Road Roller Of 8 To 10 Tonne Capacity . The Rates Inclusive Of Stacking , Transporting , Spreading , Royality , Other Levies And Other Applicable Taxes Etc . Complete As Per Specification And Instruction Of The Manager-In-Charge . ( Payments Shall Be Made On The Basis Of Consolidated Thickness Of Boulder Soling ) , Providing And Laying In Position Plain Cement Concrete Of Proportion 1:4:8 ( 1 Cement : 4 Coarse Of Sand: 8 Graded Stone Aggregate Of 40Mm Nominal Size ) Excluding The Cost Of Centering , Shuttering , Finishing And Reinforcement As Per Specification , Drawing And Direction Of Eic . ( Cement Free Issue ) , Providing And Laying In Position Plain Cement Concrete Of Proportion 1:3:6 ( 1 Cement : 3 Coarse Of Sand: 6 Graded Stone Aggregate Of 20Mm Nominal Size ) Excluding The Cost Of Centering , Shuttering , Finishing And Reinforcement As Per Specification , Drawing And Direction Of Eic . ( Cement Free Issue ) , Providing And Laying In Position Reinforced Cement Concrete Of Proportion 1:1 . 5:3 ( 1 Cement : 1 . 5 Coarse Of Sand: 3 Graded Stone Aggregate Of 20Mm Nominal Size ) Excluding The Cost Of Centering , Shuttering , Finishing And Reinforcement As Per Specification , Drawing And Direction Of Eic ( Cement & Steel Free Issue ) , Centering And Shuttering Including Strutting , Bracing , Propping Etc . , Keeping The Same In Position During Concreting And Removal Of The Same After Specified Period Etc . All Complete And As Specified And Direction Of Mic . For All Concrete And Rcc Work . , Tor Steel Reinforcement For Rcc Work Including Straightening , Cutting , Bending , Placing In Position And Binding All Complete As Per Specification And Direction Of Mic . ( Reinforcement Shall Be Issued As Fim From Nalcos Store ) , Dismantling Of Rcc Including Supplying Of All Tools Ad Tackles , Machineries , Labour Etc Complete , Transporting & Disposal Of All Debris Etc At The Designated Place Within The Plant Premises As Indentified By The Manager In Charge All Complete . , Sealing Of Expansion Joint In The Concrete Road Including Removing The Filler Board If Any At The Joints Up To Specified Depth , Cleaning Of Top 25Mm For The Entire Road Width , Laying In Position Bitumen Hot Sealing Compound For Expansion For 25Mm Width & 50Mm Depth At The Joints Complete Including The Cost Of Bitumen As Per The Instruction Of Manager In Charge . ( Bitumen Will Be Supplied By Agency ) . Last date of submission for this tender is 2020-09-02. This is a Wrist Watch tender in Cpp, Nalco, Angul, Odisha
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free