Western Railway
Important Info
AOC Description
Western Railway has published Supply Of Hex Head Bolt, Hex Head Screw ,Hex Nuthex Head Bolt, Hex Head Screw ,Hex Nut,Hex Nut M12 Prevailing Torque Type As Per, Din6925/Din980v, Property Class-10 To Is: 1367 -2002 Pt-8, A3b. Quantity Required In Packing Of 20 Nos. Specn: Din6925/Din980v, Property C Lass-10 To Is: 1367 -2002 Pt-8, A3b [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Hex Nut M16 Prevailing Torque Type As Per, Din6925/Din980v, Property Class-10 To Is: 1367 -2002 Pt-8, A3b. Note- Quantity Required In Packing Of 8 Nos. Specn: Din6925/Din980v, Prop Erty Class-10 To Is: 1367 -2002 Pt-8, A3b [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Hex Head Bolt M16x170 High Tensile As Per Is:1364 Part-1-2002,Ce-With Proper Ty Class 10.9 To Is:1367 Part-3-2002,Coating As Per Mdts-057. Brand/Source- As Per Rcf Se Rvice Bulletin No. Rcfimech/Sb-M/2021/1 (Revision-2 Or Latest) [ Warranty Period: 30 Month S After The Date Of Delivery ] ] , Hex Head Screw M 16X55 High Tensile As Per Is:1364 Part -2-2002, Ce-With Prop Erty Class Mdts-057. 10.9 To Is: 1367 Part-3-2002,Coating As Per Brand/Source- As Per Rcf Service Bulletin No. Rcfimech/Sb-M/2021/1 (Revision-2 Or Latest) [ Warranty Period: 30 Mon Ths After The Date Of Delivery ] ] , Hex Head Bolt M16x65 High Tensile As Per Is:1364 Fpart-1-2002, Ce-With Prope Rty Class 10.9 To Is:1367 Part-3-2002, Coating As Per Mdts-057. Brand/Ssource- As Per Rcf Service Bulletin No. Rcfimech/Sb-Mi2021/1 (Revision-2 Or Latest [ Warranty Period: 30 Mont Hs After The Date Of Delivery ] ] , Hex Head Bolt M 20X120 High Tensile As Per Is:1364 Part-1-2002,Ce-With Prope Rty Class 10.9 To Is:1367 Part-3-2002,Coating As Per Mdts-057. Brand/Source- As Per Rcf S Ervice Bulletin No. Rcfimech/Sb-Mi2021/1 (Revision-2 Or Latest) [ Warranty Period: 30 Mont Hs After The Date Of Delivery ] ] , Hex Head Screw M 16X45 High Tensile As Per Is:1364 Part -2-2002, Ce-With Prop Erty Class 10.9 To Is: 1367 Part-3-2002,Coating As Per Mdts-057. Brand/Source- As Per Rcf Ser. Last date of submission for this tender is 2025-09-08. This is a Railway Ancillaries tender in Parel, Maharashtra
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

