Rural Development Department
- AOC value
- ₹27.79L
- AOC date
- 24 Feb
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 24 Feb 26AOC date
- -Published
- -Closes
- -Bid opens
- 24 Feb 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 24/02/2026
- Authority
- Rural Development Department
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rural Development Department has published Tender For 4. Lwm Under Sbm Gramin Ii At Pimpalwandi Tal Junnar Dist Pune Open Class 2928730 - Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum,Hard mururm and boulders ,WBM roads, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. 2 Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete 3 Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. 4 Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete 5 Providing internal cement plaster 20mm thick in Single coats in cement mortar 1:4 without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing etc.Complete 6 Providing and casting in situ Cement Concrete of metal of approved quality for RCC work as per detailed deawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surface curing,etc. complete. Use of L & T, A.C.C ,Ambuja,Birla Gold, Manikgad, Rajashree etc. cement is permitted. 7 Providing and fixing in position steel bar reinforcement of various diameters for RCC pipes, caps, footings, foundation, slabs, beams, columns, canopies, staircases. newels, chajjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete. (including cost of binding wire) 8 Providing and fixing in position steel fibre reinforced concrete (S.F.R.C.) frame and covers of approved make including loading, unloading, transportation, all taxes, etc. complete as directed by Engineerin-charge (560 mm dia.) For pit - Size 540 mm Dia. 9 Providing and laying and fixing P.V.C. pipe of 110 mm dia. 4 kg/cm² pipe With fitting, including cost of pipe, fitting material, labour, do - - etc. complete. 10 Providing soling using 80 mm trap metal for foundation and bedding including dewatering formwork, competing and curing etc. Complete 11 Soak pit 2 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 12 Soak pit 3 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 13 Soak pit 4 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 14 Soak pit 5 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 15 Soak pit 6 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 16 Soak pit 7the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 17 Soak pit 8 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 18 Soak pit 9 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 19 Soak pit 10 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 20 Soak pit 11the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 21 Soak pit 12 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 22 Soak pit 13 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 23 Soak pit 14the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 24 Soak pit 15 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 25 Soak pit 16 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 26 Soak pit 17 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 27 Soak pit 18 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 28 Soak pit 19 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 29 Soak pit 20 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 30 Soak pit 21 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 31 Soak pit 22 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 32 Soak pit 23 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 33 Soak pit 24 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 34 Soak pit 25 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 35 Soak pit 26 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 36 Soak pit 27 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 37 Soak pit 28 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 38 Soak pit 29 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work 39 Soak pit 30 the items, quantityand rates are same as andmust be taken as sr no . 1 to 10 during execution of work . Last date of submission for this tender is 2025-09-27. This is a Waste Disposal Services tender in Pune, Maharashtra
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
2 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free