Rashtriya Chemicals And Fertilizers Limited

Distribution And Conditioning
m/s. rcf ltd.thal- alibag, maharashtra
AOC Value₹33.36 Lac
AOC Date31 Aug 2021
Completion DaysRefer Docs
Bid AmountRefer Docs

Important Info

Result ID
Refer Docs
Award of Contract
31/08/2021
Authority
Rashtriya Chemicals And Fertilizers Limited
Published Date
Refer Docs
Tender Closing Date
Refer Docs
Tender No
55(00)/2025-2026/XXX/5XX
Bidding URL
https://www.exampletenders.gov.in/bid/98765
Tender
View Tender
Bidder Details
Bidder Name: Mr. Jhon Doe, Ranking 2

AOC Description

Rashtriya Chemicals And Fertilizers Limited has published Notice Inviting E-Tender For Lining Up Of Rate Contract For Pp/Hdpe/Frp Jobs ( Supply , Installation And Site Repair Jobs ) At Rcf Thal . , Rates For Frp Jobs-Isopthalic Resins / Bisphenol Resins , Supply Material For Ir ( Iso ) Lining/ Patch Work-Per Mm Thk , Ir ( Iso ) Lining / Patch Work-Per Mm Thk , Supply Material For Br Lining/Patch Work Per Mm Thk , Br Lining / Patch Work Per Mm Thk , Supply Of Ir -Pipings- ( Pipe Size-Outside Diameter ) For 4 . 8 Mm , Up To 32 Mm For 4 . 8 Mm Thk , 33 To 63 Mm For 4 . 8 Mm Thk , 64 To 90 Mm For 4 . 8 Mm Thk , 91 To 110 Mm For 4 . 8 Mm Thk , 111 To 140 Mm For 4 . 8 Mm Thk , 141 To 160 Mm For 4 . 8 Mm Thk , 161 To 225 Mm For 4 . 8 Mm Thk , 226 To 275 Mm For 4 . 8 Mm Thk , Rates For Dismantling , Fabrication & Erection Of Ir -Pipings- ( Pipe Size-Outside Diameter ) For 4 . 8 Mm , Up To 32 Mm For 4 . 8 Mm Thk , 33 To 63 Mm For 4 . 8 Mm Thk , 64 To 90 Mm For 4 . 8 Mm Thk , 91 To 110 Mm For 4 . 8 Mm Thk , 111 To 140 Mm For 4 . 8 Mm Thk , 141 To 160 Mm For 4 . 8 Mm Thk , 161 To 225 Mm For 4 . 8 Mm Thk , 226 To 275 Mm For 4 . 8 Mm Thk , Supply Of Ir-Pipings- ( Pipe Size-Outside Diameter ) Per Mm , Up To 32 Mm For Per Mm Thk , 33 To 63 Mm For Per Mm Thk , 64 To 90 Mm For Per Mm Thk , 91 To 110 Mm For Per Mm Thk , 111 To 140 Mm For Per Mm Thk , 141 To 160 Mm For Per Mm Thk , 161 To 225 Mm For Per Mm Thk , 226 To 275 Mm For Per Mm Thk , Rates For Dismantling , Fabrication & Erection Of Ir -Pipings- ( Pipe Size-Outside Diameter ) For Per Mm , Up To 32 Mm For Per Mm Thk , 33 To 63 Mm For Per Mm Thk , 64 To 90 Mm For Per Mm Thk , 91 To 110 Mm For Per Mm Thk , 111 To 140 Mm For Per Mm Thk , 141 To 160 Mm For Per Mm Thk , 161 To 225 Mm For Per Mm Thk , 226 To 275 Mm For Per Mm Thk , Supply Of Br -Pipings- ( Pipe Size-Outside Diameter ) For 4 . 8 Mm , Up To 32 Mm For 4 . 8 Mm Thk , 33 To 63 Mm For 4 . 8 Mm Thk , 64 To 90 Mm For 4 . 8 Mm Thk , 91 To 110 Mm For 4 . 8 Mm Thk , 111 To 140 Mm For 4 . 8 Mm Thk , 141 To 160 Mm For 4 . 8 Mm Thk , 161 To 225 Mm For 4 . 8 Mm Thk , 226 To 275 Mm For 4 . 8 Mm Thk , Rates For Dismantling , Fabrication & Erection Of Br -Pipings- ( Pipe Size-Outside Diameter ) For 4 . 8 Mm , Up To 32 Mm For 4 . 8 Mm Thk , 33 To 63 Mm For 4 . 8 Mm Thk , 64 To 90 Mm For 4 . 8 Mm Thk , 91 To 110 Mm For 4 . 8 Mm Thk , 111 To 140 Mm For 4 . 8 Mm Thk , 141 To 160 Mm For 4 . 8 Mm Thk , 161 To 225 Mm For 4 . 8 Mm Thk , 226 To 275 Mm For 4 . 8 Mm Thk , Supply Of Br-Pipings- ( Pipe Size-Outside Diameter ) Per Mm , Up To 32 Mm For Per Mm Thk , 33 To 63 Mm For Per Mm Thk , 64 To 90 Mm For Per Mm Thk , 91 To 110 Mm For Per Mm Thk , 111 To 140 Mm For Per Mm Thk , 141 To 160 Mm For Per Mm Thk , 161 To 225 Mm For Per Mm Thk , 226 To 275 Mm For Per Mm Thk , Rates For Dismantling , Fabrication & Erection Of Br -Pipings- ( Pipe Size-Outside Diameter ) For Per Mm , Up To 32 Mm For Per Mm Thk , 33 To 63 Mm For Per Mm Thk , 64 To 90 Mm For Per Mm Thk , 91 To 110 Mm For Per Mm Thk , 111 To 140 Mm For Per Mm Thk , 141 To 160 Mm For Per Mm Thk , 161 To 225 Mm For Per Mm Thk , 226 To 275 Mm For Per Mm Thk , Rate For Only Repair Per Joint-Ir , Repair/Joint Ir - Up To 32 Mm , Repair/Joint Ir -33 To 63 Mm , Repair/Joint Ir - 64 To 90 Mm , Repair/Joint Ir -91 To 110 Mm , Repair/Joint Ir - 111 To 140 Mm , Repair/Joint Ir - 141 To 160 Mm , Repair/Joint Ir -161 To 225 Mm , Repair/Joint Ir - 226 To 275 Mm , Rate For Only Repair Per Joint-Br , Repair/Joint Br - Up To 32 Mm , Repair/Joint Br - 33 To 63 Mm , Repair/Joint Br -64 To 90 Mm , Repair/Joint Br -91 To 110 Mm , Repair/Joint Br -111 To 140 Mm , Repair/Joint Br -141 To 160 Mm , Repair/Joint Br - 161 To 225 Mm , Repair/Joint Br -226 To 275 Mm , Rates For Hdpe/Pp Jobs , Lining / Patch Work Per Sq . Meter Per Mm Thk -Hdpe ( Including Surface Preparation ) , Lining / Patch Work Per Sq . Meter Per Mm Thk- Pp ( Including Surface Preparation ) , Supply Of Sheets Per Sq . Meter Per Mm Thk - Hdpe , Supply Of Sheets Per Sq . Meter Per Mm Thk- Pp , Rates For Supply Of Hdpe Pipes , Supply Of Hdpe Pipe Up To 32 Mm Per Meter Per Mm Thk , Supply Of Hdpe Pipe 33 To 63 Mm Per Meter Per Mm Thk , Supply Of Hdpe Pipe 64 To 90 Mm Per Meter Per Mm Thk , Supply Of Hdpe Pipe 91 To 110 Mm Per Meter Per Mm Thk , Supply Of Hdpe Pipe 111 To 140 Mm Per Meter Per Mm Thk , Supply Of Hdpe Pipe 141 To 160 Mm Per Meter Per Mm Thk , Supply Of Hdpe Pipe 161To 225 Mm Per Meter Per Mm Thk , Supply Of Hdpe Pipe 226 To 275 Mm Per Meter Per Mm Thk , Supply Of Hdpe Pipe 276 To 350 Mm Per Meter Per Mm Thk , Supply Of Hdpe Pipe 351 To 410 Mm Per Meter Per Mm Thk , Rates For Dismantling , Fabircation & Erection Of Hdpe Pipes , Dismantling , Fabircation & Erection Of Hdpe Pipe Up To 32 Mm Per Meter Per Mm Thk , Fabircation & Erection Of Hdpe Pipe 33 To 63 Per Meter Per Mm Thk , Dismantling , Fabircation & Erection Of Hdpe Pipe 64 To 90 Per Meter Per Mm Thk , Dismantling , Fabircation & Erection Of Hdpe Pipe 91To 110 Per Meter Per Mm Thk , Dismantling , Fabircation & Erection Of Hdpe Pipe 111 To 140 Per Meter Per Mm Thk , Dismantling , Fabircation & Erection Of Hdpe Pipe 141 To 160 Per Meter Per Mm Thk , Dismantling , Fabircation & Erection Of Hdpe Pipe 161 To 225 Mm Per Mm Per Thick , Dismantling , Fabircation & Erection Of Hdpe Pipe 226 To 275 Mm Per Mm Per Thick , Dismantling , Fabircation & Erection Of Hdpe Pipe 276 To 350 Mm Per Mm Per Thick , Dismantling , Fabircation & Erection Of Hdpe Pipe 351 To 410 Per Meter Per Mm Thk , Supply Of Hdpe 45/90 Degree Elbow , Up To 32 Mm Per Mm Per Thick , 33 To 63 Mm Per Mm Per Thick , 64 To 90 Mm Per Mm Per Thick , 91 To 110 Mm Per Mm Per Thick , 111 To 140 Mm Per Mm Per Thick , 141 To 160 Mm Per Mm Per Thick , 161To 225 Mm Per Mm Per Thick , 226 To 275 Mm Per Mm Per Thick , 276 To 350 Mm Per Mm Per Thick , 351 To 410Mm Per Mm Per Thick , Dismantling , Fabrication & Erection Of Hdpe 45/90 Degree Elbow , Up To 32 Mm Per Mm Per Thick , 33 To 63 Mm Per Mm Per Thick , 64 To 90 Mm Per Mm Per Thick , 91 To 110 Mm Per Mm Per Thick , 111 To 140 Mm Per Mm Per Thick , 141 To 160 Mm Per Mm Per Thick , 161To 225 Mm Per Mm Per Thick , 226 To 275 Mm Per Mm Per Thick , 276 To 350 Mm Per Mm Per Thick , 351 To 410Mm Per Mm Per Thick , Supply Of Hdpe Equal/Unequal Tees , Up To 32 Mm Per Mm Per Thick , 33 To 63 Mm Per Mm Per Thick , 64 To 90 Mm Per Mm Per Thick , 91 To 110 Mm Per Mm Per Thick , 111 To 140 Mm Per Mm Per Thick , 141 To 160 Mm Per Mm Per Thick , 161To 225 Mm Per Mm Per Thick , 226 To 275 Mm Per Mm Per Thick , 276 To 350 Mm Per Mm Per Thick , 351 To 410Mm Per Mm Per Thick , Dismantling , Fabrication & Erection Of Hdpe Equal/Unequal Tees , Up To 32 Mm Per Mm Per Thick , 33 To 63 Mm Per Mm Per Thick , 64 To 90 Mm Per Mm Per Thick , 91 To 110 Mm Per Mm Per Thick , 111 To 140 Mm Per Mm Per Thick , 141 To 160 Mm Per Mm Per Thick , 161To 225 Mm Per Mm Per Thick , 226 To 275 Mm Per Mm Per Thick , 276 To 350 Mm Per Mm Per Thick , 351 To 410Mm Per Mm Per Thick , Supply Of Hdpe Concentric / Ecentric Reducer , Up To 32 Mm Per Mm Per Thick , 33 To 63 Mm Per Mm Per Thick , 64 To 90 Mm Per Mm Per Thick , 91 To 110 Mm Per Mm Per Thick , 111 To 140 Mm Per Mm Per Thick , 141 To 160 Mm Per Mm Per Thick , 161To 225 Mm Per Mm Per Thick , 226 To 275 Mm Per Mm Per Thick , 276 To 350 Mm Per Mm Per Thick , 351 To 410Mm Per Mm Per Thick , Dismantling , Fabrication & Erection Of Hdpe Concentric / Ecentric Reducer , Up To 32 Mm Per Mm Per Thick , 33 To 63 Mm Per Mm Per Thick , 64 To 90 Mm Per Mm Per Thick , 91 To 110 Mm Per Mm Per Thick , 111 To 140 Mm Per Mm Per Thick , 141 To 160 Mm Per Mm Per Thick , 161To 225 Mm Per Mm Per Thick , 226 To 275 Mm Per Mm Per Thick , 276 To 350 Mm Per Mm Per Thick , 351 To 410Mm Per Mm Per Thick , Supply Of Hdpe Flanges , Up To 32 Mm Per Mm Per Thick , 33 To 63 Mm Per Mm Per Thick , 64 To 90 Mm Per Mm Per Thick , 91 To 110 Mm Per Mm Per Thick , 111 T. Last date of submission for this tender is 2021-07-08. This is a Pipes tender in M/s. Rcf Ltd.thal- Alibag, Maharashtra

Insurance Surety Bond

Fast, Reliable & Accepted for EMD/PBG

  • Zero BG Limit Impact
  • Accepted in All Tenders
  • Quick Online Quote

Tender Documents

  • Tender Document 1html
lock-red

Unlock the Tender details for free

description-svgrepo

Bidder Details

Bidder NameTechnical BidFinancial BidAOCBid ValueRank
Sharma infra projects pvt ltd
₹1,24,50,000.00L1
Verma constructions ltd
₹1,31,00,000.00L2
Nair engineering works
₹1,38,75,000.00L3
Iyer industrial solutions
₹1,43,20,000.00L4
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in