🎉 Your free trial plan has started. Plan will expire in 0 days

Pimpri Chinchwad Municipal Corporation

pune, maharashtra

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Pimpri Chinchwad Municipal Corporation has published Providing Mandap And Furniture For Various Functions In Ward No 21 Pimpri For The Year 2025 26-Hire charges for Truck 5.5 cum per 10 tonnes including operator, disel, oil and other necessary labour etc. maintainance, Hire charges for cranes (5 tonne capacity) including operator, disel, oil and other necessary maintainance, labour etc. complete (PWD/DSR/06-07/stat-A3/-) Hire charges for Hydraulic Excavator (BEML BE 200, Tata Hitachi EX200) Hire charges for crane (20 tonne) including operator, disel , oil and other necessary maintainance, labour etc. complete. Hire Charges for JCB including operator, disel, oil and other necessary mainatainance, labour etc. complete. Hire charges for Truck 5.5 cum per 10 tonnes including operator, disel, oil and other necessary labour etc. maintainance, Hire charges for cranes (5 tonne capacity) including operator, disel, oil and other necessary maintainance, labour etc. complete (PWD/DSR/06-07/stat-A3/-) Hire charges for Hydraulic Excavator (BEML BE 200, Tata Hitachi EX200) Hire charges for crane (20 tonne) including operator, disel , oil and other necessary maintainance, labour etc. complete. Hire Charges for JCB including operator, disel, oil and other necessary mainatainance, labour etc. complete. labour etc.(R ate/Sq.ft.) h) For eight day Hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(R ate/Sq.ft.) i) For nine day Hire charges for providing and erecting temporary pendal with cotton cover including all materrial transporation and labour etc.(R ate/Sq.ft.) j) For ten day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) a) For one day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) b) For two day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) c) For three day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) d) For four day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) e) For five day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) f) For Six day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) e) For seven day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) h) For eight day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) i) For nine day Hire charges for providing and erecting tempory mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete rate/sq.ft.) j) For ten day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc. complete Ht 34ft. rate/sq.ft) a) For one day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete Ht 34ft. rate/sq.ft) b) For two day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material Page No - 4 and transportation and labour etc.complete Ht 34ft. rate/sq.ft) c) For three day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete Ht 34ft. rate/sq.ft) d) For four day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete Ht 34ft. rate/sq.ft) e) For five day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete Ht 34ft. rate/sq.ft) f) For Six day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete Ht 34ft. rate/sq.ft) g) For seven day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete Ht 34ft. rate/sq.ft) h) For eight day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc. complete Ht 34ft. rate/sq.ft) i) For nine day Hire charges for providing and erecting stage with back screen wall and with wooden planks covered with cotton matting including all material and transportation and labour etc.complete Ht 34ft. (rate/sq.ft) j) For ten day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. a) For one day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. b)For two day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. c) For three day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. d) For four day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. e) For five day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. f) For Six day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. g) For seven day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. h) For eight day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. i) For nine day Hire charges for providing and erecting heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. j) For ten day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) a) For one day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) b)For two day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) c) For three day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) d) For four day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) e) For five day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) f) For Six day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota e tc complete (rate/rft) g) For seven day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) h) For eight day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) i) For nine day Hire charges for providing and erecting stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) j) For ten day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) a) For one day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) b)For two day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) c) For three day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) d) For four day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) e) For five day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) f) For Six day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) e)For seven day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) h) For eight day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) i) For nine day Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rat e/no) j) For ten day Hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . Complete (rate/No) a) For one day Hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . Complete (rate/No) b)For two day Hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . Complete (rate/No) c) For three day Hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . Complete (rate/No) d) For four day Hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc . Complete (rate/No) e) For five day Hire charges for providing and erecting box type wooden kaman (gate) including bullies and bracking with bamboo including all material transportation and labour etc .. Last date of submission for this tender is 2025-11-13. This is a Furnitures tender in Pune, Maharashtra

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in