Pimpri Chinchwad Municipal Corporation
- AOC value
- ₹14.99L
- AOC date
- 10 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 10 Dec 25AOC date
- -Published
- -Closes
- -Bid opens
- 10 Dec 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 10/12/2025
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Pimpri Chinchwad Municipal Corporation has published Tender For Providing Mandap Arrangement And Supplying Labour And Vehicles For Ganpati Visharjan Programme At Ward No 15-36.000 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for thefoundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means 24.000 Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means 60.000 Removing and Transporting of excavated / demolished material within PCMC limit including loading, unloading, stacking the material as directed by Engineer-in-charge etc. complete. (For Lead 10.0 Km). 150.000 Supplying mazdoor/unskilled heavy male labour etc. 800.000 Hire charges for Truck 5.5 cum per 10 tonnes including operator, disel, oil and other necessary maintainance, labour etc. 80.000 Hire charges for crane (10 tonne capacity ) including operator,disel , oil and other necessary maintainance , labour etc. complete. 56.000 Hire charges for Excavator (JCB JS140/Tata Hitachi EX120 or equivalent)) 0.6Cum Capacity including operator, disel , oil and other necessary maintainance , labour etc. complete. 2.000 Hire charges for supplying drinking water set for period as directed by engineer in charge including two stain less steel drum 50 glasses and two jugs. etc. complete (rate/job) For Two day 5.000 Hire charges for providing and erecting plain kaman (double wasa) including all material transportation and labour etc. complete (Rate/no) For one day 400.000 Hire charges for providing and erecting temporary mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) a) For Two day 1.000 Hire charges for providing and erecting woodenpost tower for electric halogen lamp etc. for period as directed by Engineer in charge. Height of pole = 25ft. (Rate/no.) For Five day 2.000 Hire charges for providing and erecting woodenpost tower for electric halogen lamp etc. for period as directed by Engineer in charge. Height of pole = 25ft. (Rate/no.) ForSeven day 400.000 Hire charges for providing and erecting temporary mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) a) For one day 200.000 Hire charges for providing and erecting temporary mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) a) For Five day 300.000 Hire charges for providing and erecting temporary mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) a) For Seven day 200.000 Hire charges for providing and erecting temporary mandap with C.G.I. sheet covering and cotton cover including all materails transportation and labour ect. complete (rate/sq.ft.) a) For Ten day 400.000 Hire charges for providing and erecting stage with back screen wall and with wooden planks coverd with cotton matting including all material and transportation and labour etc.complete Ht 34ft. (rate/sq.ft) a) For one day 100.000 Hire charges for providing and erecting stage with back screen wall and with wooden planks coverd with cotton matting including all material and transportation and labour etc.complete Ht 34ft. (rate/sq.ft) a) For Two day 50.000 Hire charges for providing and erecting stage with back screen wall and with wooden planks coverd with cotton matting including all material and transportation and labour etc.complete Ht 34ft. (rate/sq.ft) a) For Ten day 100.000 Hire charges for providing and erecting stage heavy stage with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. a) For one day 100.000 Hire charges for providing and erecting stage heavy stage Royalty, RA, MJP and Garden DSR with back screen wall and with wooden planks covered with cotton matteing including all material trasportation and labour etc. complete (Ht 34 Ft.) rate/sq.ft. a) For Two day 10.000 Hire charges for providing and erecting Stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) a) For one day 5.000 Hire charges for providing and erecting Stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) a) For two day 10.000 Hire charges for providing and erecting Stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) a) For Seventh day 10.000 Hire charges for providing and erecting Stage open decoration with bullies bamboo and zalar covered with cotton patti and pagota etc complete (rate/rft) a) For ten day 1.000 Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) a) For one day 2.000 Hire charges for providing and erecting cotton gate (sadi Kaman) including all marerial transportation and labour etc.complete (rate/no) a) For Two day 2.000 Hire charges for providing and erecting box type wooden kaman (gate) including bullies and braeking with bamboo including all material transportation and labour etc . Complete (rate/No) a) For one 1.000 Hire charges for providing and erecting box type wooden kaman (gate) including bullies and braeking with bamboo including all material transportation and labour etc . Complete (rate/No) a) For two day 40.000 Hire charges for providing and erecting bamboo / iron ralling (Baracating) with bullies and bamboo up to 4 ft to 6ft. high including all materrial and transporation and labour etc. complete (rate/Rft). a) For one day 10.000 Hire charges for providing and erecting bamboo / iron ralling (Baracating) with bullies and bamboo up to 4 ft to 6ft. high including all materrial and transporation and labour etc. complete (rate/Rft). a) For two day 50.000 Hire charges for providing and erecting cloth walling (10 to 12ht) including bamboo bracing including all material transportation and labour etc . Complete (rate/ sq.ft) a) For one day 200.000 Hire charges for providing and erecting C.G.I. sheet walling (10 to 12 ht) including vertical and horizantal bracing including all material transportation and labour etc. complete (rate/Rft) a) For one day 100.000 Hire charges for providing and erecting C.G.I. sheet walling (10 to 12 ht) including vertical and horizantal bracing including all material transportation and labour etc. complete (rate/Rft) a) For Two day 100.000 Hire charges for providing and erecting C.G.I. sheet walling (10 to 12 ht) including vertical and horizantal bracing including all material transportation and labour etc. 10.000 Hire charges for supplying center table coverd with cotton white cover decorated with frill including all material transportation and labour etc. complete (rate/no) For two day 5.000 Hire charges for supplying center table coverd with cotton white cover decorated with frill including all material transportation and labour etc. complete (rate/no) For Six day 5.000 Hire charges for supplying center table coverd with cotton white cover decorated with frill including all material transportation and labour etc. complete (rate/no) For Seven day 10.000 Hire charges for supplying center table coverd with cotton white cover decorated with frill including all material transportation and labour etc. complete (rate/no) For Ten day 50.000 Hire charges for providing and laying jute matting including all trasportation and labour etc. Complete (Rate/Sq.ft.) For Ten day 1.000 Hire charges for supplying Rosturm in good condition and pollishing etc complete (rate/No.) For one day 2.000 Hire charges for supplying Rosturm in good condition and pollishing etc complete (rate/No.) For Two day 1.000 Hire charges for supplying Rosturm in good condition and pollishing etc complete (rate/No.) For ten day 8.000 Hire charges for supplying drinking water set for period as directed by engineer in charge including two stain less steel drum 50 glasses and two jugs. etc. complete (rate/job) For Ten day 4.000 Hire charges for providing and erecting plain kaman (double wasa) including all material transportation and labour etc. complete (Rate/no) For Five day 500.000 Hire charge s for supplying wooden table of 6 x 2 long in goood condition and covered with cotton white cover including all material transportation and labour etc. complete (rate/no) For Ten day 15.000 Hire charges for suppplying cotton matters (gadhi) with white bed sheet (3 x6)including all material transporation and labour etc complete (rate/no) For one day. Last date of submission for this tender is 2025-08-11. This is a Tent tender in Pimpri, Maharashtra
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free