🎉 Your free trial plan has started. Plan will expire in 0 days

Kalyan Dombivli Municipal Corporation

kalyan dombivli municipal corporation area, maharashtra

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Kalyan Dombivli Municipal Corporation has published Operation , Maintenance , Repairs And Replacement For Electrical And Mechanical Equipment To 147 Mld Capacity Raw Water Pumping Station At Mohone And Pure Water Treatment Plant At Barave For The Period Of Two Year . , Item No . :-1Operation , Maintenance , Repairs & Replacement For Electrical & Mechanical Equipment , To Operate 147 Mld Capacity Water Works Of Barave Water Treatment Plant At Barave & Water Head Works At Mohane Including All Spare Parts , Labour For Operating 24 X 7 , Repair / Replacement Within Stipulated Time Period , Day To Day Maintenance Of Machinery , Cost Of All Labour , Material Etc . As Directed By The Engineer Incharge . Under This Item The Work Of Operation ( Including Raw Water Pumps , Chemical Dosing , Washing Of Filters , Testing Of Water As Per Norms & Pure Water , Wash Water , Recirculation Pumps Etc . ) , Periodical & Routine Maintenance & Repair Of Electrical & Mechanical Equipments With Material , , Reguler Cleaning ( Raw Water Chanel , Raw Water Sum , Areation Fountain , Clarifacculetor , Filters , Recirculation Well , Chlorine Contact Tank & Pure Water Sump , Sweeping & Keep Clean The Premises Of Raw Water Pump House & Barve Wtp . , Item No . 2Overhauling With Repairing 1250 Kva /1600 Kva Transformer: Dismantling The Existing 1250 / 1600 Kva , 22 Kv/0 . 433 Kv Crompten Greaves Make On Load Tap Changer Type Transformer By Means Of Hydra/ Crane Of Suitable Capacity , Cleaning All Healthy Parts , Laminations ( In Assembly ) , Tank , Insulating Sleeves Etc . Overhauling The Transformer With Replacement Of Damaged Parts And Rewound Coils And Reassembling Of Top Yoke Including Brazing , Soldering , Sleeving And Insulating As Required , Vacuum Oven Drying Of Assembled Core . Reassembling Of Complete Transformer By Tanking The Dried Core , Cleaning All Gaskets , Making Terminal Connections , Oil Filling , Filtration , Rewinding Of Hv & Lv Coils , Using New Copper Coil With New Insulation Including Internal & External Painting Of Transformer With Rebate For Damaged Material , To & Fro Transportation Charges Loading/ Unloading Making Connections With All Required Materials , Testing , Commissioning With Six Month Guarantee Etc Complete . , Item No . 3Overhauling With Repairing 500 Kva Transformer: Dismantling The Existing 500 Kva , 22 Kv/0 . 433 Kv Volt Amps Make Off Load Tap Chane Type Transformer By Means Of Hydra/ Crane Of Suitable Capacity , Cleaning All Healthy Parts , Laminations ( In Assembly ) , Tank , Insulating Sleeves Etc . Overhauling The Transformer With Replacement Of Damaged Parts And Rewound Coils And Reassembling Of Top Yoke Including Brazing , Soldering , Sleeving And Insulating As Required , Vacuum Oven Drying Of Assembled Core . Reassembling Of Complete Transformer By Tanking The Dried Core , Cleaning All Gaskets , Making Terminal Connections , Oil Filling , Filtration , Rewinding Of Hv & Lv Coils , Using New Copper Coil With New Insulation Including Internal & External Painting Of Transformer With Rebate For Damaged Material , To & Fro Transportation Charges Loading/ Unloading Making Connections With All Required Materials , Testing , Commissioning With Six Month Guarantee Etc Complete . , Item No . 4Overhauling With Repairing 1800 Kva Transformer: Dismantling The Existing 1800 Kva , 22 Kv/3 . 3 Kv Volt Amps Make Off Load Tap Chane Type Transformer By Means Of Hydra/ Crane Of Suitable Capacity , Cleaning All Healthy Parts , Laminations ( In Assembly ) , Tank , Insulating Sleeves Etc . Overhauling The Transformer With Replacement Of Damaged Parts And Rewound Coils And Reassembling Of Top Yoke Including Brazing , Soldering , Sleeving And Insulating As Required , Vacuum Oven Drying Of Assembled Core . Reassembling Of Complete Transformer By Tanking The Dried Core , Cleaning All Gaskets , Making Terminal Connections , Oil Filling , Filtration , Rewinding Of Hv & Lv Coils , Using New Copper Coil With New Insulation Including Internal & External Painting Of Transformer With Rebate For Damaged Material , To & Fro Transportation Charges Loading/ Unloading Making Connections With All Required Materials , Testing , Commissioning With Six Month Guarantee Etc Complete . . Last date of submission for this tender is 2020-06-08. This is a Electromechanical Work tender in Kalyan Dombivli Municipal Corporation Area, Maharashtra

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1pdf
  • Tender Document 2pdf
  • Tender Document 3html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in