Delhi Metro Rail Corporation Limited
Important Info
AOC Description
Delhi Metro Rail Corporation Limited has published Geotechnical Investigation Work Geotechnical Investigation Work For Preparation Of Dpr For Extension Of Mumbai Metro Line-5 From Rajiv Gandhi Chowk To Temghar And Durgadi Chowk To Ulhasnagar , Field Investigation , Drilling Of Bore Hole In All Types Of Strata . , A ) G . L . To 10 M , B ) 10 To 20 M , C ) More Than 20 M , Drilling In Rock Required Cutting By Diamond Bits / Cutters , A ) In Weathered Rock , B ) In Hard Rock , Carry Out Spt Tests , Collecting Disturbed Samples , Collecting Undisturbed Samples , Conducting Permeability Test , A ) In Over Burden Using Falling Head , B ) In Rock With Packers , Collecting Water Samples , Laboratotory Test , Soil Samples , Sieve Analysis , Hydrometer Analysis , Specific Gravity , Moisture Content , Dry Density , Atterberg Limits , Direct Shear Tests . , Traixial Shear Test , Chemical Analysis , A ) Soil , B ) Water , Rock Samples , Density Tests , Water Absorption And Porosity , Determination Of Hardness , Unconfined Compression Tests , Carry Out Point Load Index , Modulus Of Elasticity , Abrasion Testing , Report , Provide Final Report 1 Set ( 7 Copies ) . Last date of submission for this tender is 2020-10-06. This is a Drilling Work tender in Mumbai, Maharashtra, Maharashtra
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
- Tender Document 2xlsx
- Tender Document 3pdf
- Tender Document 4pdf
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

