Collector Office
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Collector Office
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Collector Office has published Supply Of Electrical Items For Loksabha Election, Chandrapur - 2 LED Bulb / Halogen Light (1000 wt) with fitting per unit – Rate for one day3 LED Bulb / Halogen Light (1000 wt) with fitting per unit – Rate for three days4 LED Bulb / Halogen Light (1000 wt) with fitting per unit – Rate for seven days5 LED Bulb / Halogen Light (1000 wt) with fitting per unit – Rate for fifteen days6 LED Bulb / Halogen Light (1000 wt) with fitting per unit – Rate for one month7 Flood Light (400 wt) with fitting per unit – Rate for one day8 Flood Light (400 wt) with fitting per unit – Rate for three days9 Flood Light (400 wt) with fitting per unit – Rate for seven days10 Flood Light (400 wt) with fitting per unit – Rate for fifteen days11 Flood Light (400 wt) with fitting per unit – Rate for one month12 Sound System (Single Round) per set – Rate for one day13 Sound System (Single Round) per set – Rate for three days14 Sound System (Single Round) per set – Rate for seven days15 Sound System (Single Round) per set – Rate for fifteen days16 Sound System (Single Round) per set – Rate for one month17 Sound System (Double Round) per set – Rate for one day18 Sound System (Double Round) per set – Rate for three days19 Sound System (Double Round) per set 19 Sound System (Double Round) per set - Rate for seven days20 Sound System (Double Round) per set - Rate for fifteen days21 Sound System (Double Round) per set - Rate for one month22 Sound System (Triple Round) per set - Rate for one day23 Sound System (Triple Round) per set - Rate for three days24 Sound System (Triple Round) per set - Rate for seven days25 Sound System (Triple Round) per set - Rate for fifteen days26 Sound System (Triple Round) per set - Rate for one month27 Tube light (40 wt) per piece - Rate for one day28 Tube light (40 wt) per piece - Rate for three days29 Tube light (40 wt) per piece - Rate for seven days30 Tube light (40 wt) per piece - Rate for fifteen days31 Tube light (40 wt) per piece - Rate for one month32 Bulb (100 wt) per piece - Rate for one day33 Bulb (100 wt) per piece - Rate for three days34 Bulb (100 wt) per piece - Rate for seven days35 Bulb (100 wt) per piece - Rate for fifteen days36 Bulb (100 wt) per piece - Rate for one month37 Ceiling Fan per piece - Rate for one day38 Ceiling Fan per piece - Rate for three days39 Ceiling Fan per piece - Rate for seven days40 Ceiling Fan per piece - Rate for fifteen days41 Ceiling Fan per piece - Rate for one month Rate per month42 Pedestal Fan per unit - Rate for one day43 Pedestal Fan per unit - Rate for three days44 Pedestal Fan per unit - Rate for seven days45 Pedestal Fan per unit - Rate for fifteen days46 Pedestal Fan per unit - Rate for one month47 Computer Point per unit - Rate for one day48 Computer Point per unit - Rate for three days49 Computer Point per unit - Rate for seven days50 Computer Point per unit - Rate for fifteen days51 Computer Point per unit - Rate for one month52 Main Switch Panel Board per unit - Rate for one day53 Main Switch Panel Board per unit - Rate for three days54 Main Switch Panel Board per unit - Rate for seven days55 Main Switch Panel Board per unit - Rate for fifteen days56 Main Switch Panel Board per unit - Rate for one month57 LCD Television Set (32 inch) per unit - Rate for one day58 LCD Television Set (32 inch) per unit - Rate for three days59 LCD Television Set (32 inch) per unit - Rate for seven days60 LCD Television Set (32 inch) per unit - Rate for fifteen days61 LCD Television Set (32 inch) per unit - Rate for one month62 LCD Television Set (45 inch) per unit - Rate for one day63 LCD Television Set (45 inch) per unit - Rate for three days64 LCD Television Set (45 inch) per unit - Rate for seven days65 65. LCD Television Set (45 inch) per unit – Rate for fifteen days66. LCD Television Set (45 inch) per unit – Rate for one month67. LCD Television Set (55 inch) per unit – Rate for one day68. LCD Television Set (55 inch) per unit – Rate for three days69. LCD Television Set (55 inch) per unit – Rate for seven days70. LCD Television Set (55 inch) per unit – Rate for fifteen days71. LCD Television Set (55 inch) per unit – Rate for one month72. LED Television Set (55 inch) per unit – Rate for one day73. LED Television Set (55 inch) per unit – Rate for three days74. LED Television Set (55 inch) per unit – Rate for seven days75. LED Television Set (55 inch) per unit – Rate for fifteen days76. LED Television Set (55 inch) per unit – Rate for one month77. LED Screen per unit – Rate for one day78. LED Screen per unit – Rate for three days79. LED Screen per unit – Rate for seven days80. LED Screen per unit – Rate for fifteen days81. LED Screen per unit – Rate for one month82. LCD Projector with Screen per unit – Rate for one day83. LCD Projector with Screen per unit – Rate for three days84. LCD Projector with Screen per unit – Rate for seven days85. LCD Projector with Screen per unit – Rate for fifteen days86. LCD Projector with Screen per unit – Rate for one month. Last date of submission for this tender is 2025-11-11. This is a Electrical Products tender in Chandrapur, Maharashtra
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free