Collector Office
- AOC value
- ₹7Cr
- AOC date
- 11 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 11 Mar 24AOC date
- -Published
- -Closes
- -Bid opens
- 11 Mar 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 11/03/2024
- Authority
- Collector Office
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Collector Office has published Tender For Mandap, Material Supply-1.01 Letter Shed ( Per Day Rate ) 1.02 Patra Shed ( Rate Per Second Day Onwards ) 1.03 Patra Shed ( Rate For One Month ) 1.04 Water Drum ( 500 Litres ) ( Per Day Rate ) 1.05 Water Drum ( 500 Litres ) ( Rate From Every Other Day ) 1.06 Water Drum ( 500 Litres ) ( Rate For One Month ) 1.07 Mandap / Pendol ( Water Proof ) ( Per Day Rate ) 1.08 Mandap / Pendol ( Water Proof ) ( Rate Per Second Day Onwards ) 1.09 Mandap / Pendol ( Water Proof ) ( Rate For One Month ) 1.1 Mandap / Pendol ( Simple ) ( Per Day Rate ) 1.11 Mandap / Pendol ( Rate Per Second Day Onwards ) 1.12 Mandap / Pendol ( Rate For One Month ) 1.13 Jute Carpet ( Per Day Rate ) 1.14 Jute Carpet ( Rate Per Second Day Onwards ) 1.15 Jute Carpet ( Rate For One Month ) 1.16 Table Cover ( Per Day Rate ) 1.17 Table Cover ( Rates From Second Day Onwards ) 1.18 Table Cover ( Rate For One Month ) 1.19 Partition Cloth ( 7 Feet High ) ( Per Day Rate ) 1.2 Partition Cloth ( 7 Feet High ) ( Rate Per Second Day Onwards ) 1.21 Partition Cloth ( 7 Feet High ) ( Rate For One Month ) 1.22 Satranji ( 9 X 18 Feet ) ( Per Day Rate ) 1.23 Satranji ( 9 X 18 Feet ) ( Per Second Day Rate ) 1.24 Satranji ( 9 X 18 Feet ) ( Rate For One Month ) 1.25 Cloth Satranji ( 9 X 12 Feet ) ( Per Day Rate ) 1.26 Kapdi Satranji ( 9 X 12 Feet ) ( Per Second Day Rate ) 1.27 Cloth Satranji ( 9 X 12 Feet ) ( Rate For One Month ) 1.28 Mat Mat ( Per Day Rate ) 1.29 Mats Per Mat ( Rate From Second Day Onwards ) 1.3 Mat Mat ( Rate For One Month ) 1.31 Carpet ( Per Day Rate ) 1.32 Carpet ( Rate From Second Day Onwards ) 1.33 Carpet ( Rate For One Month ) 1.34 Cloth Pavilion With Gi Sheet Shed ( Per Day Rate ) 1.35 Cloth Mandap With Gi Letterhead ( Per Second Day Rate ) 1.36 Cloth Mandap With Gi Sheets ( Rate For One Month ) 1.37 Table ( 2 X 4 ) Feet ( Per Day Rate ) 1.38 Table ( 2 X 4 ) Feet ( Rate Per Second Day ) 1.39 Table ( 2 X 4 ) Feet ( Rate For One Month ) 1.4 Table ( 6 X 2 ) Feet ( Per Day Rate ) 1.41 Table ( 6 X 2 ) Feet ( Rate Per Second Day ) 1.42 Table ( 6 X 2 ) Feet ( Rate For One Month ) 1.43 Folding Table ( 4 X 2 ) Feet ( Per Day Rate ) 1.44 Folding Table ( 4 X 2 ) Feet ( Rate Per Second Day ) 1.45 Folding Table ( 4 X 2 ) Feet ( Rate For One Month ) 1.46 Folding Table ( 4 X 2 ) With Foot Frill ( Per Day Rate ) 1.47 Folding Table ( 4 X 2 ) With Foot Frill ( Rates Per Second Day ) 1.48 Folding Table ( 4 X 2 ) With Foot Frill ( Rate For One Month ) 1.49 Chair ( Plastic ) With Arm ( Per Day Rate ) 1.5 Chair ( Plastic ) With Arm ( Rate Per Second Day Onwards ) 1.51 Chair ( Plastic ) With Arm ( Rate For One Month ) 1.52 Chair ( Plastic ) Without Arm ( Per Day Rate ) 1.53 Chair ( Plastic ) Without Arm ( Per Second Day Rate ) 1.54 Chair ( Plastic ) Without Arm ( Rate For One Month ) 1.55 Drawer Table ( Per Day Rate ) 1.56 Drawer Table ( Rate From Second Day Onwards ) 1.57 Drawer Table ( Rate For One Month ) 1.58 Mattress, Bed Sheet, Sheet / Blanket And Pillow ( With Cover ) ( Per Day Rate ) 1.59 Mattress, Bed Sheet, Sheet / Blanket And Pillow ( With Cover ) ( Per Second Day Rate ) 1.6 Mattress, Bed Sheet, Sheet / Blanket And Pillow ( With Cover ) ( Rate For One Month ) 1.61 Sofa Three Seater ( Rate Per Day ) 1.62 Sofa Three Seater ( Rate Per Second Day Onwards ) 1.63 Sofa Three Seater ( Rate For One Month ) 1.64 Dunlop Chair, Executive Chair ( Per Diem Rate ) 1.65 Dunlop Chair, Executive Chair ( Per Second Day Rate ) 1.66 Dunlop Chair, Executive Chair ( Rate For One Month ) 1.67 Wooden Stage 2 Feet High ( Per Day Rate ) 1.68 Wooden Stage 2 Feet High ( Rate Per Second Day ) 1.69 Wooden Stage 2 Feet High ( Rate For One Month ) 1.7 Dice 1 Foot Tall ( Per Day Rate ) 1.71 Dice 1 Foot Tall ( Rates From Every Other Day ) 1.72 Dice 1 Foot High ( Rate For One Month ) 1.73 Wooden Ramp For Handicapped ( 1.20 M Wide Minimum ) ( Per Day Rate ) 1.74 Wooden Ramp For Handicapped ( 1.20 M Wide Minimum ) ( Rate Per Second Day Onwards ) 1.75 Wooden Ramp For Handicapped ( 1.20 M Wide Minimum ) ( Rate For One Month ) 1.76 Wooden Steps ( 1.20 M Wide Minimum ) ( Per Day Rate ) 1.77 Wooden Steps ( 1.20 M Wide Minimum ) ( Rate Per Second Day Onwards ) 1.78 Wooden Steps ( 1.20 M Wide Minimum ) ( Rate For One Month ) 1.79 Iron Steps ( 1.20 M Wide Minimum ) ( Per Day Rate ) 1.8 Iron Steps ( 1.20 M Wide Minimum ) ( Rate Per Second Day Onwards ) 1.81 Iron Steps ( 1.20 M Wide Minimum ) ( Rate For One Month ) 1.82 Executive Table With Frills ( Per Day Rate ) 1.83 Executive Table With Frills ( Per Second Day Rate ) 1.84 Executive Table With Frills ( Rate For One Month ) 1.85 Mobile Toilet Simple ( Per Day Rate ) 1.86 Mobile Toilet Simple ( Rate Per Second Day Onwards ) 1.87 Mobile Toilet Simple ( Rate For One Month ) 1.88 Fire Extinguisher ( Per Day Rate ) 1.89 Fire Extinguisher ( Per Second Day Rate ) 1.9 Fire Extinguisher ( Rate For One Month ) 1.91 Bally / Bamboo Barricading ( Per Day Rate ) 1.92 Bally / Bamboo Barricading ( Rate Per Second Day Onwards ) 1.93 Bally / Bamboo Barricading ( Rate For One Month ) 1.94 Barricading ( 3 Ft Sheet And 3 Ft Mesh Over It ) ( Per Day Rate ) 1.95 Barricating ( 3 Ft. Sheet And 3 Ft. Mesh Over It ) ( Per Second Day Rate ) 1.96 Barricating ( 3 Ft Sheet And 3 Ft Net Over It ) ( Rate For One Month ) 1.97 Iron Barricading ( Per Day Rate ) 1.98 Iron Barricading ( Per Second Day Rate ) 1.99 Iron Barricading ( Rate For One Month ) 2 Cgi Sheet Partitions ( 7 Feet High ) Panhali Patra ( Per Day Rate ) 2.01 Cgi Sheet Partition ( 7 Feet High ) Panhali Patra ( Rate Per Second Day Onwards ) 2.02 Cgi Sheet Partition ( 7 Feet High ) Panhali Patra ( Rate For One Month ) 2.03 Plywood ( 04 Mm ) ( Per Day Rate ) 2.04 Plywood ( 04 Mm ) ( Rate Per Second Day Onwards ) 2.05 Plywood ( 04 Mm ) ( Rate For One Month ) 2.06 Plywood ( 06 Mm ) ( Per Day Rate ) 2.07 Plywood ( 06 Mm ) ( Rate Per Second Day Onwards ) 2.08 Plywood ( 06 Mm ) ( Rate For One Month ) 2.09 Plywood ( 08 Mm ) ( Per Day Rate ) 2.1 Plywood ( 08 Mm ) ( Rate Per Second Day Onwards ) 2.11 Plywood ( 08 Mm ) ( Rate For One Month ) 2.12 Plywood ( 12 Mm ) ( Per Day Rate ) 2.13 Plywood ( 12 Mm ) ( Rate Per Second Day Onwards ) 2.14 Plywood ( 12 Mm ) ( Rate For One Month ) 2.15 Plywood ( 24 Mm ) ( Per Day Rate ) 2.16 Plywood ( 24 Mm ) ( Rate Per Second Day ) 2.17 Plywood ( 24 Mm ) ( Rate For One Month ) 2.18 Sheet Partition ( Per Day Rate ) 2.19 Sheet Partition ( Rate From Second Day Onwards ) 2.2 Sheet Partition ( Rate For One Month ) 2.21 Chain Link Mesh Partition 7 Feet High ( Per Day Rate ) 2.22 Chain Link Mesh Partition 7 Feet High ( Rate Per Second Day ) 2.23 Chain Link Mesh Partition 7 Feet High ( Rate For One Month ) . Last date of submission for this tender is 2024-02-03. This is a Tent tender in chandrapur, Maharashtra
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free