Central Railway
Important Info
AOC Description
Central Railway has published Supply Of supply and installation of retrofitting , supply and installation of retrofitting of battery disconnect facility in ips monitored through data logger in installed hbl make ips systems. (for 17 locations- covered under amc/warranty) [ warran ty period: 30 months after the date of delivery ] ] , supply and installation of retrofitting of battery disconnect facility in ips monitored through data logger in installed hbl make ips systems. (for 11 locations- not covered under amc/warranty) [ wa rranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-08-31. This is a Data Logger tender in Bhusawal, Maharashtra
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

