Central Railway
Important Info
AOC Description
Central Railway has published Supply Of switch plate assembly complete with polycarbonate cover frame , switch plate assembly complete with polycarbonate cover frame and powder coated steel pl ate consists of (i) on-off switch - 3 nos. (ii) 3 pin socket (6a, 250v ac) - 2 nos. (iii) glass fuse 2a of m/s fe rraz shawmut/cooper bussman/equivalent (with fuse holders) - 2 nos. as per icf/edml-006 rev: b, drg no . icf/sk3-7-4-011, alt- c, item-1. (the switch plate assembly shall be in the following order with inscription as - 110v , cs, l , cs , 110 v [ warranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-10-15. This is a Switch Supply tender in Mumbai, Maharashtra
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

