Central Railway
- AOC value
- ₹2.86L
- AOC date
- 13 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 13 Aug 25AOC date
- -Published
- -Closes
- -Bid opens
- 13 Aug 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 13/08/2025
- Authority
- Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Central Railway has published Supply Of %U201cdisconnecting And Earthing Device, 8 Pole, 2 Way,%U201cdisconnecting And Earthing Device, 8 Pole, 2 Way,,%U201cdisconnecting And Earthing Device, 8 Pole, 2 Way, Without Off, On Load 125A 1000V Ac, 2 No +2Nc And With Heavy Duty Handle, & Pad Locking Arrangement In Off Position, Mounte D In A Stainless Steel Enclosure, Suitable For Ac 23 Duly Confirming To Is/Iec 60947 And Confirming To R Dso/Pe/Spec/0192-2018(Rev.1) Max. Dept Including Handle 480Mm. Note: The Purchase Of This Materi Al Should Be Done As Per Annexure-D Of Bill Of Material For Switchboard Cabinet(S1) From Rdso Specific Ation Rdso/Pe/Spec/0192-2018 (Rev.1).%U201d1 [ Warranty Period: 30 Months After The Date Of De Livery ] ]. Last date of submission for this tender is 2025-08-11. This is a Electrification Work tender in Pune, Maharashtra
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free