Central Railway
Important Info
AOC Description
Central Railway has published Supply Of arm rest complete with pu pad for lhb , arm rest complete with pu pad for lhb non ac chair car (50% rh & 50% lh) aluminum base to be pressure die casting as per judw drg. no. judw/mech/16-656 (cp-6) . all items in drawing should be in assembled condition. (pu pad in black colour) [ warranty period: 30 months after the date of deliv ery ] ] , arm rest for shatabdi coaches as per drawing no: mw/m-6-172 (cp-2) with pu pad in black colour. 50% lh and 50% rh required. all items in drawing should be in assembled condition. [ warranty period: 30 months after the date of delivery ] ] , elbow arm rest complete as per drg no. j & td/cw/sk-1180 (cp-4) . all items in drawin g should be in assembled condition (pu pad in black colour) [ warranty period: 12 months after the d ate of delivery ] ]. Last date of submission for this tender is 2026-09-08. This is a Railway Ancillaries tender in Bhusawal, Maharashtra
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

