🎉 Your free trial plan has started. Plan will expire in 0 days

Western Railway

ratlam, madhya pradesh

AOC value
₹7.54L
AOC date
8 May
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 8 May 26AOC date

Important info

Result ID
Refer Docs
Award of contract
08/05/2026
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Western Railway has published Supply Of lateral buffer, axle guide bearing, bump stop, stabilizer link, modified upper spring pad, motor suspension bush/spherical, motor suspension pad, centre pivot bearing & traction bar/metal rubber bush , lateral buffer for vb ts coaches to gmt drg.no.62093501, rev05 items are to be manufactu red as per ms. ec engineering rubber-metal elements specification no mt 18br2 001468-03 [ warranty pe riod: 30 months after the date of delivery ] ] , axle guide bearing for vb ts coaches to gmt drg.no.64064102, rev-04 items are to be man ufactured as per ms. ec engineering rubber-metal elements specification no mt 18br2 001468-03 [ warra nty period: 30 months after the date of delivery ] ] , bump stop for vb ts coaches to gmt drg.no.62049602, rev-05 items are to be manufacture d as per ms. ec engineering rubber-metal elements specification no mt 18br2 001468-03 [ warranty peri od: 30 months after the date of delivery ] ] , stabilizer link for vb ts coaches to gmt drg.no. 65087601, rev03 items are to be manufactu red as per ms. ec engineering rubber-metal elements specification no mt18br2 001468-03. [ warranty pe riod: 30 months after the date of delivery ] ] , modified upper spring pad for vb ts coaches to gmt drg.no.62093401, rev-10 items are to b e manufactured as per ms. ec engineering rubber-metal elements specification no mt 18br2 001468-03 [ warranty period: 30 months after the date of delivery ] ] , motor suspension bush/spherical joint for vb ts coaches to gmt drg.no. 64064201, rev-06 it ems are to be manufactured as per ms. ec engineering rubber-metal elements specification no mt 18br2 0 01468-03 [ warranty period: 30 months after the date of delivery ] ] , motor suspension pad for vb ts coaches to gmt drg.no.63052101, rev-04 items are to be m anufactured as per ms. ec engineering rubber-metal elements specification no mt 18br2 001468-03 [ war ranty period: 30 months after the date of delivery ] ] , centre pivot bearing for vb ts coaches to gmt drg.no.41057501, rev-02 items are to be ma nufactured as per ms. ec engineering rubber-metal elements specification no mt 18br2 001468-03 [ warr anty period: 30 months after the date of delivery ] ] , traction bar/metal rubber bush for vb ts coaches to gmt drg.no.65081502, rev-05 items ar e to be manufactured as per ms. ec engineering rubber-metal elements specification no mt 18br2 001468- 03 [ warranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-05-05. This is a Railway Ancillaries tender in Ratlam, Madhya Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in