West Central Railway
Important Info
AOC Description
West Central Railway has published Supply Of control arm assembly left & right consisting of 02(two) items , control arm assembly left consisting of 02(two) items (i) control arm upper t o rcf drg. no. 1277122 alt 01 r3, qty-01 no. (ii) control arm lower left to fiat-sig schienenfa hrgeuge ags drg. no. 1267716, ver-00 r2, qty-01 no., material and technical specification n o. 17.334 100 06/107 01, with amendment no.-1 of march 2005, mdts-241, rev.-02, is:1865-1991, reaffirmed 2005, sg-400/18l. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] , control arm assembly right consisting of 02(two) items (i) control arm upper to rcf drg. no. 1277122 alt 01 r3, qty-01 no. (ii) control arm lower right to fiat-sig schienenfahrgeuge ags drg. no. 1267717, ver-00 r2, qty-01 no., material and technical spec ification no. 17.334 100 06/107 01, with amendment no.-1 of march 2005, mdts-241, rev.-02, is:1 865-1991, reaffirmed 2005, sg-400/18l. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]. Last date of submission for this tender is 2026-08-05. This is a Railway Ancillaries tender in null, Madhya Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

