West Central Railway
- AOC value
- ₹1.15L
- AOC date
- 25 Jul
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 25 Jul 26AOC date
- -Published
- -Closes
- -Bid opens
- 25 Jul 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 25/07/2026
- Authority
- West Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
West Central Railway has published Supply Of switch plate assembly complete with poly , switch plate assembly complete with poly-carbonate cover frame and powder coated ste el plate/gi plate without powder coated of minimum thickness 1.0 mm with 2 nos. on/off switches an d 2 nos. 3 pin sockets 6 amp. 250 volt with 04 nos. 1.0 amp. glass fuses with holder as per edml-125 rev.- 6 item no. 2 of table no. 2 and drawing no. cc 74254 alt.-c. one set consisting of 10 nos switch p late assembly. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]. Last date of submission for this tender is 2026-05-08. This is a Switch Supply tender in null, Madhya Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free