West Central Railway
Important Info
AOC Description
West Central Railway has published Supply Of supply ,installation, commissioning and training of temperature calibrator test set up , supply ,installation, commissioning and training of temperature calibrator test set up for thre e phase locos as per technical specification attached. (01) firms to note:- firm should upload technical spe cification comparison with railway requirement otherwise summarily rejected. [ warranty period: 30 mo nths after the date of delivery ] ]. Last date of submission for this tender is 2026-07-31. This is a Temperature Controller tender in Itarsi, Madhya Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

