Water Resources Department
Important Info
AOC Description
Water Resources Department has published Tender For On Turn-Key Basis Management, Operation And Maintenance Of Existing Pressurized Irrigation Schemes Of Bansujaramajor Project - On Turn-key basis- Management, Operation and Maintenance of existing pressurized irrigation schemes of BansujaraMajor Project for 3 Years covering 3 years of Bansujara Left Bank open canal with itsall structures and complete distribution network by Pipeline covering Culturable Command Area (CCA) 75000 Ha. on Turn-key basis comprising of operation and maintenance of all Pumps (7 Nos), Switch yard & Transmission lines 8.60km, (1 Nos), Rising Mains (713m), Gravity Mains (480.387 Km),HDPE Pipe line (8459 Km.), OMS (3535 Nos.) SCADA, filling and operation ofBalancing Reservoirs (1No.), Distribution Chamber (2 Nos), . Distribution network of 75000 ha CCA of complete scheme including the proper distribution of water up to 1 ha Chak including watch and ward of complete scheme. Along with testing and calibration of all electro-mechanical components before the start of irrigation period every year in the O&M Period of 3 Years which may further be extendable up to next Five years. The Contractor shall adhere to the requirements in the Guidelines of “Operation and Maintenance Requirements for Pressurized Micro Irrigation Systems”, MPWRD, December 2016, guidelines and circulars issued by the Department and amended from time to time. The Contractor shall follow the appropriate Standard Operating Procedures (SOPs) as prescribed by the Water Resource Department. 2 On Turn-key basis- Management, Operation and Maintenance of existing pressurized irrigation schemes of BansujaraMajor Project for 3 Years covering 3 years of Bansujara Left Bank open canal with itsall structures and complete distribution network by Pipeline covering Culturable Command Area (CCA) 75000 Ha. on Turn-key basis comprising of operation and maintenance of all Pumps (7 Nos), Switch yard & Transmission lines 8.60km, (1 Nos), Rising Mains (713m), Gravity Mains (480.387 Km),HDPE Pipe line (8459 Km.), OMS (3535 Nos.) SCADA, filling and operation ofBalancing Reservoirs (1No.), Distribution Chamber (2 Nos), . Distribution network of 75000 ha CCA of complete scheme including the proper distribution of water up to 1 ha Chak including watch and ward of complete scheme. Along with testing and calibration of all electro-mechanical components before the start of irrigation period every year in the O&M Period of 3 Years which may further be extendable up to next Five years.The Contractor shall adhere to the requirements in the Guidelines of “Operation and Maintenance Requirements for Pressurized Micro Irrigation Systems”, MPWRD, December 2016, guidelines and circulars issued by the Department and amended from time to time. The Contractor shall follow the appropriate Standard Operating Procedures (SOPs) as prescribed by the Water Resource Department. . Last date of submission for this tender is 2025-09-17. This is a Irrigation Work tender in Tikamgarh, Madhya Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
- Tender Document 2pdf
- Tender Document 3xlsx
- Tender Document 4pdf
- Tender Document 5pdf
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

