South Eastern Coalfields Limited
- AOC value
- ₹23.82L
- AOC date
- 25 May
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 25 May 24AOC date
- -Published
- -Closes
- -Bid opens
- 25 May 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 25/05/2024
- Authority
- South Eastern Coalfields Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
South Eastern Coalfields Limited has published Tender For Salvaging Of Enm Equipments From Underground Of Jamuna 5 / 6 Incline To Surface Head At Jamuna 1-2 Mine Of Jugro Sub Area.- 1 C4 Conveyor Belt 2 ( A ) Dismantling And Transportation Of 1000 / 800Mm Size Double Drum Driven Drive Head With Loop Take-Up Upto Lead Of 100M Including Electrical Switches. 3 ( B ) Transportation Through Haulage From Ug To Surface Including Loading Unloading In Tub / Trolley 4 C5 Conveyor Belt 5 ( A ) Dismantling And Transportation Of 800Mm Size Single Drive Drum Driven Drive Head Without Loop Take-Up Upto Lead Of 100M ( Pony Belt ) Including Electrical Switches. 6 ( B ) Transportation Through Haulage From Ug To Surface Including Loading Unloading In Tub / Trolley 7 C6 Conveyor Belt 8 ( A ) Dismantling And Transportation Of 800Mm Size Single Drive Drum Driven Drive Head Without Loop Take-Up Upto Lead Of 100M ( Pony Belt ) Including Electrical Switches. 9 ( B ) Transportation Through Haulage From Ug To Surface Including Loading Unloading In Tub / Trolley 10 C7 Conveyor Belt 11 ( A ) Dismantling And Transportation Of 800Mm Size Single Drive Drum Driven Drive Head Without Loop Take-Up Upto Lead Of 100M ( Pony Belt ) Including Electrical Switches. 12 ( B ) Transportation Through Haulage From Ug To Surface Including Loading Unloading In Tub / Trolley 13 C8 Conveyor Belt 14 ( A ) Dismantling And Transportation Of 800Mm Size Single Drive Drum Driven Drive Head Without Loop Take-Up Upto Lead Of 100M ( Pony Belt ) Including Electrical Switches. 15 ( B ) Transportation Through Haulage From Ug To Surface Including Loading Unloading In Tub / Trolley 16 C9 Conveyor Belt 17 ( A ) Dismantling And Transportation Of 1000 / 800Mm Size Double Drum Driven Drive Head With Loop Take-Up Up-To Lead Of 100M Including Electrical Switches. 18 ( B ) Transportation Through Haulage From Ug To Surface Including Loading Unloading In Tub / Trolley. 19 22D Conveyor Belt 20 ( A ) Dismantling And Transportation Of 800Mm Size Single Drive Drum Driven Drive Head Without Loop Take-Up Upto Lead Of 100M ( Pony Belt ) Including Electrical Switches. 21 ( B ) Transportation Through Haulage From Ug To Surface Including Loading Unloading In Tub / Trolley 22 C3 Conveyor Belt 23 ( A ) Dismantling Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug . 24 ( B ) Transporting Of Belt Structure Of 800Mm / 1000Mm Including Rollers From Ug To Surface. 25 C4 Conveyor Belt 26 ( A ) Dismantling Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug . 27 ( B ) Transporting Of Belt Structure Of 800Mm / 1000Mm Including Rollers From Ug To Surface. 28 C5 Conveyor Belt 29 ( A ) Dismantling Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug . 30 ( B ) Transporting Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug Upto Haulage Track Line. 31 ( C ) Transporting Of 50M Length Belt Structure Of 800Mm / 1000Mm Including Rollers From Ug To Surface. 32 C6 Conveyor Belt 33 ( A ) Dismantling Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug . 34 ( B ) Transporting Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug Upto Haulage Track Line. 35 ( C ) Transporting Of 170M Length Belt Structure Of 800Mm / 1000Mm Including Rollers From Ug To Surface. 36 C7 Conveyor Belt 37 ( A ) Dismantling Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug . 38 ( B ) Transporting Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug Upto Haulage Track Line. 39 ( C ) Transporting Of 60M Length Belt Structure Of 800Mm / 1000Mm Including Rollers From Ug To Surface. 40 C8 Conveyor Belt 41 ( A ) Dismantling Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug . 42 ( B ) Transporting Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug Upto Haulage Track Line. 43 ( C ) Transporting Of 120M Length Belt Structure Of 800Mm / 1000Mm Including Rollers Fromug To Surface. 44 C9 Conveyor Belt 45 ( A ) Dismantling Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug . 46 ( B ) Transporting Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug Upto Haulage Track Line. 47 ( C ) Transporting Of 700M Length Belt Structure Of 800Mm / 1000Mm Including Rollers From Ug To Surface Through Haulage. 48 22D Pony Conveyor Belt 49 ( A ) Dismantling Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug . 50 ( B ) Transporting Of Belt Structure Of 800Mm / 1000Mm Including Rollers In Ug Upto Haulage Track Line. 51 ( C ) Transporting Of 140M Length Belt Structure Of 800Mm / 1000Mm Including Rollers From Ug To Surface Through Haulage. 52 Transportation Of 800Mm Pvc Belting Of Length 200M From Surface To District Or One District To Another District Up Lead Of 1Km. ( 4200 Mtr Belt To Be Transported From Ug To Surface. ) 53 Shifting Of Tsu & Vcb, Un-Coupling, Coupling With 250M Armoured Cables ( 50 / 70 / 90Mm2 ) Laying Thereof Within The District In Ug Within Lead Of 250M. ( Qty. 03 No. Sets To Be Transported From Ug To Surface ) 54 Shifting Of Main Switches ( Acb / Me / Ml Etc ) , Un-Coupling, Jk Area Coupling With 100M Armoured Cables ( 50 / 70Mm2 ) Laying Thereof Within The District In Ug With Lead Of 100M. ( Approx. 18 Nos. Set To Be Transported From Ug To Surface ) 55 Loading, Transportation And Unloading Of 100M Track Line ( I.E. 100Mx2=200M Rail Of 30 Ibs ) From Surface / Old Working To Site Of Installation In Ug For A Lead Of 2 Km. ( Approx. 4, 000 Mtr Track Line To Be Transported From Ug To Surface ) 56 Dismantling Of Haulage Track Line ( Both Side Track ) Of 100M Length ( I.E. 100X2=200M ) Rail Of 30 Lbs In Ug 57 Dismantling, Transportation And Installation Of Endless Haulage And Above Considering At A Lead Of 1-2 Km From Old Site To New Site In Ug Or From Surface To Ug Site Of Installation. ( 02 Nos. Endless Haulage+01No. Direct Haulage To Be Transported From Ug To Surface ) 58 Shifting Of Haulage Return Pulley Complete Dismantling, Transporting And Installation From One Site To Another Site In Ug For A Distance Of 200 M. ( 05 Nos. Haulage Return Pulley Complete To Be Transported From Ug To Surface . Approx. Avg. Distance 800 Mtrs. ) 59 Transportation Of One Ht / Lt Pump ( Below 500 Gpm ) Capacity From Surface To Underground Working Or U / G Working To U / G New Working Site Or Vice-Versa At Lead Of 1000M ( 1Km ) . ( 05 Nos. Pump To Be Transported From Ug To Surface ) 60 Transportation Of Ht / Lt Motor, Starter Etc Of Ht / Lt Pump ( Below 500 Gpm Capacity } From Surface To Ug Old Working / New Working Or Old Working To New Working Or Vice-Versa For Lead Of 1Km ( 05 Nos. Motor, Starter Set To Be Transported From Ug To Surface ) 61 Transportation Of One Ht / Lt Pump ( From 500 Gpm To 1000 Gpm ) Capacity From Surface To Underground Working Or U / G Working To U / G New Working Site Or Vice-Versa At Lead Of 1000M ( 1Km ) . ( 04 Nos. Pump To Be Transported From Ug To Surface ) 62 . Transportation Of Ht / Lt Motor, Starter Etc Of Ht / Lt Pump ( From 500 To 1000 Gpm Capacity ) From Surface To Ug Old Working / New Working Or Old Working To New Working Or Vice-Versa For Lead Of 1Km. ( 04 Nos. Motor, Starter Set To Be Transported From Ug To Surface ) 63 Transportation Of 300M 3 / 4 Pipe ( 6M Each 50 Number ) From Surface To Ug Or One District To Another District In Ug At Lead 1000M. ( Approx. 800 Mtr Pipe Line To Be Transported From Ug To Surface ) 64 Transportation Of 300M 6 Pipe ( 6M Each 50 Number ) From Surface To Ug Or One District To Another District In Ug At Lead 1000M. ( Approx. 1000 Mtr Pipe Line To Be Transported From Ug To Surface ) 65 Transportation / Carriage Of Steel Structure By Manual Labour Including Loading, Unloading & Stacking The Same For Lead Upto 50M In Underground. 66 Transportation Of Steel Materials Like Girder, Haulage Rope Etc. Through Haulage From Ug To Surface At A Lead Of 1000M Including Unloading And Stacking At Surface. ( Roof Support Girder, Haulage Rope Etc. To Be Transported ) 67 Total Impact Of Gst For The Purpose Of Ctc. Last date of submission for this tender is 2024-04-09. This is a Mechanical engineering Service tender in kotma, Madhya Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free