Ministry Of Earth Sciences
- AOC value
- ₹29.01L
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Ministry Of Earth Sciences
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Ministry Of Earth Sciences has published Bids Are Invited For Cassette Type 3 Ton Ac , Cassette Type 1.5 Ton Ac , Split Ac 2 Ton , Split Ac 1.5 Ton ( Hot & Cold) , Two Ac Timer ( 4 Hrs/8 Hrs Time Period) Isi Mark , Ac Voltage Stabilizer ( Suitable To Each Ac Unit, As Above) , Unit Installation Charge (In Inr) For Sr. No. 1 , Cost Of The Outdoor Unit Stand(Floor- Mounted) (In Inr) For Sr No. 1 , Extra Piping Cost Per Meter Of Pipe (Including Insulation) Above The Standard Length Of >= 3M (In Inr/Meter) For Sr. No. 1 , Extra Cabling Cost Per Meter Of Cable Above The Standard Length Of >= 3M (In Inr/Meter). The Requirement Is Without Any Joint. For Sr. No. 1 , Cost Of Drainpipe Per Meter (In Inr/Meter) For Sr. No.1 , Unit Installation Charge (In Inr) For Sr. No. 2 , Cost Of The Outdoor Unit Stand(Floor-Mounted) (In Inr) For Sr No. 2 , Extra Piping Cost Per Meter Of Pipe (Including Insulation) Above The Standard Length Of >= 3M (In Inr/Meter) For Sr. No. 2 , Extra Cabling Cost Per Meter Of Cable Above The Standard Length Of >= 3M (In Inr/Meter). The Requirement Is Without Any Joint. For Sr. No. 2 , Cost Of Drainpipe Per Meter (In Inr/Meter) For Sr. No.2 , Unit Installation Charge(In Inr) For Sr. No. 3 , Cost Of The Outdoor Unit Stand(Floor-Mounted) (In Inr) For Sr. No. 3 , Extra Piping Cost Per Meterof Pipe (Including Insulation) Above The Standard Length Of>= 3M (In Inr/Meter) For Sr. No. 3 , Extra Cabling Cost Permeter Of Cable Above The Standard Length Of >= 3M (Ininr/Meter). The Requirement Is Without Any Joint. For Sr. No.3 , Cost Of Drainpipe Per Meter (In Inr/Meter) For Sr. No. 3 ,Unit Installation Charge (In Inr) For Sr. No. 4 , Cost Of Theoutdoor Unit Stand(Floor-Mounted) (In Inr) For Sr. No. 4 ,Extra Piping Cost Per Meter Of Pipe (Including Insulation)Above The Standard Length Of >= 3M (In Inr/Meter) For Sr.No. 4 , Extra Cabling Cost Per Meter Of Cable Above Thestandard Length Of >= 3M (In Inr/Meter). The Requirementis Without Any Joint. For Sr. No. 4 , Cost Of Drainpipe Permeter (In Inr/Meter) For S. Last date of submission for this tender is 2022-03-15. This is a Electrification Work tender in Bhopal, Madhya Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free