Directorate Sports And Youth Welfare
- AOC value
- ₹40L
- AOC date
- 5 Jul
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 5 Jul 22AOC date
- -Published
- -Closes
- -Bid opens
- 5 Jul 2022AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 05/07/2022
- Authority
- Directorate Sports And Youth Welfare
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Directorate Sports And Youth Welfare has published Digging Of Tubewell 1St Call E Tender For Digging Of Bore Well Supply And Installation Of Submersible Pumps Etc. 2022 First Call , Digging Of Borewell , Survey By Hydrological Expert , Borewell Digging And Casing Pipe And Joining , Borewell Digging By Dth Machine , Telescopy Bore , Hard Stator , Ms Casing Pipe Size 6.5 , Ms Casing Pipe Size 7 , Ms Casing Pipe Size 8 , Pvc Casing Pipe Size 5 , Pvc Casing Pipe Size 7 , Pvc Casing Pipe Size 8 , Joining / Welding Of Pipe To Pipe , Cutting Of Filtration Slots , Greval Pack Borewel , Pump Sets , 5Hp Jalpari Motor , 2 Hp Submersible Pump Single Phase , 3 Hp Submersible Pump Single Phase , 4 Hp Submersible Pump Three Phase , 5 Hp Submersible Pump Three Phase , 7.5 Hp Submersible Pump Three Phase , 10 Hp Submersible Pump Three Phase , 12.5 Hp Submersible Pump Three Phase , 15 Hp Submersible Pump Three Phase , 30 Hp Submersible Pump Three Phase , 40 Hp Submersible Pump Three Phase , Jalpari 2Hp , Jalpari 3Hp , Jalpari 7.5 Hp , Jalpari 10 Hp , Electrical Panel , 2 / 3 / 4Hp , 5 Hp , 7.5Hp, , 10 Hp, , 12.5 Hp , 15 Hp , Electrical Cable , 2.5 Sq Mm , 4 Sq Mm , 10 Sq Mm , 16 Sq Mm , 25 Sq Mm , Hdpe Pipes & Fittings , 63 Mmx10 Kg , 63 Mmx6 Kg , 50 Mmx10 Kg , 50 Mmx6 Kg , 40 Mmx10 Kg , 40 Mmx6 Kg , 32 Mmx10 Kg , 32 Mmx6 Kg , 1.25” Elbow , 1.5”Elbow , 2” Elbow , 2.5” Elbow , 3” Elbow , 1.25” Tee , 1.5” Tee , 2” Tee , 2.5” Tee , 3”Tee , 1.25”Ball Valve , 1.5”Ball Valve , 2” Ball Valve , 2.5” Ball Valve , 3” Ball Valve , 2”Foot Valve , 2.5” Foot Valve , 3” Foot Valve , 1.25”Union , 1.5”Union , 2” Union , 2.5” Union , 3” Union , 1.25” Bend , 1.5”Bend , 2” Bend , 2.5” Bend , 3”Bend , 1.25” End Cap , 1.5” End Cap , 2” End Cap , 2.5” End Cap , 3” End Cap , Borewell Acessories , Bore Cap , Pairs Of Ms Clamps , Gi Pipes & Fitting , 1.25”Pipe , 1.5”Pipe , 2” Pipe , 2.5” Pipe , 3” Pipe , 1.25” Elbow , 1.5”Elbow , 2” Elbow , 2.5” Elbow , 3” Elbow , 1.25” Tee , 1.5” Tee , 2” Tee , 2.5” Tee , 3”Tee , 1.25”Ball Valve , 1.5”Ball Valve , 2” Ball Valve , 2.5” Ball Valve , 3” Ball Valve , 2”Foot Valve , 2.5” Foot Valve , 3” Foot Valve , 1.25” Bend , 1.5”Bend , 2” Bend , 2.5” Bend , 3”Bend , 1.25”Union , 1.5”Union , 2” Union , 2.5” Union , 3” Union , Gi Socket 1.25 , Gi Socket 1.50 , Gi Socket 2 , Gi Socket 2.50 , Gi Socket 3 , Nipple 4X1.25 , Nipple 6X1.25 , Nipple 12X1.25 , Nipple 4X1.50 , Nipple 6X1.50 , Nipple 12X1.50 , Nipple 4X2 , Nipple 6X2 , Nipple 12X2 , Nipple 12X2.50 , Nipple 6X2.50 , Nipple 4X2.50 , Flanch 2 , Flanch 2.50 , Flanch 3 , Ci Valve 1.25 , Ci Valve 1.50 , Ci Valve 2 , Ci Valve 2.50 , Ci Valve 3 , C Pvc Pipes & Fittings , C Pvc Pipe 1.5 , C Pvc Pipe 2 , C Pvc Bend1.5 , C Pvc Bend 2 , C Pvc Elbow 1.5 , C Pvc Elbow 2 , C Pvc Tee 1.5 , C Pvc Tee 2 , Installation Of Pumpset In Borewell , Installation With Gi Pipe , Installation With Hdpe Pipe , Nylon Rope , Rates For Revolving Impact / Geared Sprinkler System , Supply Of 3 G.I. Pipeline With Necessary Fitting To Carry Water From The Main Line To The Storage Tank, With One Valves , Supply Of Hdpe Storage Tank Of Capacity 10, 000 Liters , Supply Of 7.5 H.P. Isi Marked Electric Pump Set With Required Suction & Delivery Fittings, Valve And Control Panel Duly Complete. , Supply Of 90 Mm / 4 Kg. Hdpe Pipes Isi Marked With Required Compression Fittings To Carry Water From Pump Set To The Pipeline Grid. , Supply Of 110 Mm / 4 Kg. Hdpe Pipes Isi Marked With Required Compression Fittings & Hdpe Fittings To Form A Complete Pipeline Grid , Supply Of Self Closing Hydrants With Required Hdpe Base Mountings , Supply Of Hydrant Openers , Supply Of Impact Sprinkler- , Supply Of 110 Mm - 4 Kg. Hdpe Pipes With Portable Quick Action Couplers And Required Necessary Fittings For Connection From The Pipe Grid , Mechanical Installation Of The Materials Supplied By Us , Trench Cutting & Backfilling Under Normal Soil Conditions ( 60Cm×60 Cm ) , G.I. Pipe 2 , G.I. Pipe 2.5 , Flat Pvc Cable4 Sq & 6 Sq. , Rates For Borwell / Sprinkler & Pumpset Repairs , Rewinding Of Pump Sets , 2 Hp Submersible Pump Single Phase , 3 Hp Submersible Pump Single Phase , 4 Hp Submersible Pump Three Phase , 5 Hp Submersible Pump Three Phase , 7.5 Hp Submersible Pump Three Phase , 10 Hp Submersible Pump Three Phase , 12.5 Hp Submersible Pump Three Phase , 15 Hp Submersible Pump Three Phase , 2 Hp Openwell Submersible Pump Single Phase , 3 Hp Openwell Submersible Pump Single Phase , 4 Hp Openwell Submersible Pump Three Phase , 5 Hp Openwell Submersible Pump Three Phase , 6 Hp Openwell Submersible Pump Three Phase , 7.5 Hp Openwell Submersible Pump Three Phase , 10 Hp Openwell Submersible Pump Three Phase , 2 Hp Monoblock Pump Three Phase , 3 Hp Monoblock Pump Three Phase , 5 Hp Monoblock Pump Three Phase , 7.5 Hp Monoblock Pump Three Phase , 10 Hp Monoblock Pump Three Phase , 12 Hp Monoblock Pump Three Phase , 15 Hp Monoblock Pump Three Phase , 20 Hp Monoblock Pump Three Phase , 22.5 Hp Monoblock Pump Three Phase , 25 Hp Monoblock Pump Three Phase , 30 Hp Monoblock Pump Three Phase , 40 Hp Monoblock Pump Three Phase , Electrical Panel , 2 / 3 / 4 Hp , 5 Hp , 7.5 Hp , 10 Hp , 12.5 Hp , 15 Hp , 20 / 22.5 / 25 Hp, 30 Hp , Flushing , Labour , Installation , Lowering And Taking Out Of Pumpset With Gi Pipe , Lowering And Taking Out Of Pumpset With Hdpe Pipe , Column Pipe , 1.25 , 1.50 , 2 , Socket , 1.25 , 1.50 , 2 , Bend , 1.25 , 1.50 , 2 , Digging And Fitting Of Gi Pipe Line & Hdpe Pipe Line , 1.25 , 1.50 , 2 , 2.50. Last date of submission for this tender is 2022-03-21. This is a Couplers tender in Bhopal, Madhya Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free