🎉 Your free trial plan has started. Plan will expire in 0 days

Andaman Lakshadweep Harbour Works

kiltan, lakshadweep

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Andaman Lakshadweep Harbour Works has published Tender For Renovation Of Western Side Jetty At Kiltan; 1 Abstract-IDismantling of existing damaged concreates of slab, longitudinal beams, cross beams hand rails, electric posts ,low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy machineries likeconcrete cutter, demolition hammer, breaker, etc of cost of labours complete. 2 Providing and laying design mix concrete of RCC M40 grade in accordance with IS 456 (Latest Edition) using coarse aggregate from mainland quarry, M-sand confirming to IS and 43 grade Ordinary portland cement confirming to IS 455, adding silica fume and approved plasticizer as per design mix as instructed by EIC, including cost of all materials- cement, stone chips, M-sand, cost of centering and shuttering, cost of all labour charges, mixing, conveying, placing, consolidation, screening and washing of coarse aggregate and M- sand, transportation charges of all materials to the Work Site at Kiltan, hire charges and running charges of Mixer Machine, vibrator, consumables and all other equipments, cost of minor tools etc. complete. 3 Providing and laying design mix concrete of RCC M40 grade in accordance with IS 456 (Latest Edition) using coarse aggregate from mainland quarry, M-sand confirming to IS and 43 grade Ordinary portland cement confirming to IS 455, adding silica fume and approved plasticizer as per design mix in cast-in-situ for hand rail posts, handrails and light post etc as instructed by EICincluding cost of cement, stone chips, M-sand,Silica fume & Plasticizercost of all labour charges, mixing, conveying, placing, consolidation, screening and washing of coarse aggregate and M- sand, transportation charges of all materials to the Work Site at Kiltan, hire charges and running charges of mixer machine, vibrator, consumables and all other equipments, cost of minor tools etc. complete. 4 Centering and shuttering for Hand railposts, handrails and lighpost etc including cost of all materials (Cement, M Sand, 20mm chips), form work, transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools as per the direction of EIC etc complete 5 Supply, deliver and transportation ofsteel of grade Fe 500 D HSCRM / HCR / CRS or equivalent confirming to IS 1786 with corrosion resistant element for Fabrication and fixing of reinforcement in superstructure worksas per the directions ofEIC, including cost of fabrication & fixing, cost of corrosion resistant deformed bars, all handling charges, cutting, bending, lapping, tying and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour chargs, cost of binding wire, transportation charges for all materials from to worksite at Kiltan, all T&P required for the work and minor tools etc. complete. 6 Providing and laying design mix concrete of PCC M30 grade in accordance with IS 456 (Latest Edition) using coarse aggregate from mainland quarry, m-sand confirming to IS and 43 grade Ordinary portland cement confirming to IS 455, adding silica fume and approved plasticizer as per design mix in cast-in-situ for wearing coat etc.as instructed by EIC including cost Silica fume & Plasticizer , cement, stone chips, M sand, cost of all labour charges, mixing, conveying, placing, consolidation, screening and washing of coarse aggregate and m-sand, transportation charges of all materials to the Work Site at Kiltan, hire charges and running charges of Mixer machine, vibrator, consumables and all other equipments, cost of minor tools etc. complete. 7 Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifungals over the primer coat on the hand rails, posts, hand rails, light posts and on the right sides of the newly concreated jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc. complete. 8 Providing and fixing 10T and 20T bollards on the both side of the jetty for arresting the vessels, boat with ropes for embarkation/disembarkation of passenger and cargoes excluding the cost of bollard with its fittings, transportation charges, minor tools, labour charges etc., complete. 9 10T 10 20T 11 Abstract-IIDismanting of existing damaged concreates of slab, longitudinal beams, cross beams hand rails, electric posts ,low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy mechinaries likeconcrete cutter, demolition hammer, breaker, etc of cost of labours complete. 12 Providing and laying design mix concrete of RCC M40 grade in accordance with IS 456 (Latest Edition) using coarse aggregate from mainland quarry, M-sand confirming to IS and 43 grade Ordinary portland cement confirming to IS 455, adding silica fume and approved plasticizer as per design mix as instructed by EIC, including cost of all materials- cement, stone chips, M-sand, cost of centering and shuttering, cost of all labour charges, mixing, conveying, placing, consolidation, screening and washing of coarse aggregate and M- sand, transportation charges of all materials to the Work Site at Kiltan, hire charges and running charges of Mixer Machine, vibrator, consumables and all other equipments, cost of minor tools etc. complete. 13 Supply, deliver and transportation ofsteel of grade Fe 500 D HSCRM / HCR / CRS or equivalent confirming to IS 1786 with corrosion resistant element for Fabrication and fixing of reinforcement in superstructure worksas per the directions ofEIC, including cost of fabrication & fixing, cost of corrosion resistant deformed bars, all handling charges, cutting, bending, lapping, tying and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour chargs, cost of binding wire, transportation charges for all materials from to worksite at Kiltan, all T&P required for the work and minor tools etc. complete. 14 Providing and laying design mix concrete of PCC M30 grade in accordance with IS 456 (Latest Edition) using coarse aggregate from mainland quarry, m-sand confirming to IS and 43 grade Ordinary portland cement confirming to IS 455, adding silica fume and approved plasticizer as per design mix in cast-in-situ for wearing coat etc.as instructed by EIC including cost Silica fume & Plasticizer , cement, stone chips, M sand, cost of all labour charges, mixing, conveying, placing, consolidation, screening and washing of coarse aggregate and m-sand, transportation charges of all materials to the Work Site at Kiltan, hire charges and running charges of Mixer machine, vibrator, consumables and all other equipments, cost of minor tools etc. complete. 15 Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rails, posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc. complete. 16 Providing and fixing 10T and 20T bollards on the both side of the jetty for arresting the vessals, boat with ropes forembarkation/disembarkation of passenger and cargoes excluding the cost of bollard with its fittings,tranportation charges, minor tools, labour charges etc., complete. 17 10T 18 20T . Last date of submission for this tender is 2025-10-23. This is a Jetty tender in Kiltan, Lakshadweep

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

4 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
  • Tender Document 4pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in