Kerala State Electricity Board
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Kerala State Electricity Board
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Kerala State Electricity Board has published Tender For 11KV line extension OYEC with covered conductor-2.4 KM- 1 Loading HT A type pole from the stacking place and unloading the same at work site( transport by vehicle) 2 Providing one Earth using earth pipe incl.digging & backfilling pit and supply of charcoal, salt,sand etc. 3 Erecting one CT-PT unit to existing DP and giving connections, incl . loading & unloading, excluding transportation. 4 Addictional rate for excavation of one Pit for HT Pole/HT stay in Laterite 5 Fitting one additional HT pin with insulator 6 Providing additional HT stay insulator in existing stay 7 Stringing of one km 3 PH 11kv line with XLPE Insulated ACSR Raccoon 8 Providing bridging at Cut points for 3PH 11KV Line with XLPE Insulated ACSR Raccoon 9 Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging& back filling pit, drawing earth leads 10 Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging& back filling pit, drawing earth leads 11 Addictional rate for providing one disc set on any type of HT Pole for making cut point. 12 Fitting and erecting one HT DP using PSC Pole in position incl.fitting 2 channel cross arms, digging& back filling pit, drawing earth leads. 13 Fitting & providing one HT stay for 11 KV pole incl. digging & back filling pit 14 Fitting & providing one HT strut using HT PSCpole incl. digging & back filling pit 15 Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. 16 Additional rate for excavation of Pit for A type pole in Soft Rock. 17 Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. 18 Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. 19 Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. 20 Fitting one set AB switch and giving connection 21 Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). 22 Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. 23 Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials 24 Fitting one Additional2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. 25 Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. 26 Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. 27 Fitting one additional F top bracket 28 Providing Strut using LT PSC pole incl. digging & back filling pit. 29 Drilling hole of various sizes on existing Channel/Cross Arm. 30 Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. 31 Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. 32 Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. 33 Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. 34 Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. 35 Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. 36 Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. 37 Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). 38 Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). 39 Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). 40 Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site. 41 Transporting one HT PSC pole by Hand cart (limited to 4km). 42 Loading LT PSC pole to Hand cart from the stacking place and unloading the same at work site. 43 Transporting one LT PSC pole by Hand cart - limited to 4km (excluding loading and unloading). 44 Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. 45 Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. 46 Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. 47 Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. . Last date of submission for this tender is 2025-12-30. This is a Transmission Line tender in Palakkad, Kerala
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free