🎉 Your free trial plan has started. Plan will expire in 0 days

Fertilisers And Chemicals Travancore Limited

ambalamedu, kerala

AOC value
₹9.47L
AOC date
18 Jul
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 18 Jul 20AOC date

Important info

Result ID
Refer Docs
Award of contract
18/07/2020
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Fertilisers And Chemicals Travancore Limited has published Replacement Of Various Drive Motors , Gearboxes , Trunnion Rollers , Thrust Rollers Etc . In Np And Off Site Area , Fact Cd . , Replacement Of Various Drive Motors , Gearboxes , Trunnion Rollers , Thrust Rollers Etc . In Np And Off Site Area , Fact Cd . , Replacement Of Gear Box Of Dryer A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Gear Box Of Dryer A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Gear Box Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Gear Box Shall Be Transported To Site . The Gear Box Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Gear Box . The Out Side Surface Area Of The Damaged Gear Box Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Motor Of Dryer A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Motor Of Dryer A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Motor Shall Be Loosened / Removed And Lead / Transported To Electrical Work Shop . The New / Spare Motor Shall Be Transported To Site . The Motor Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Motor . , Replacement Of Trunnion Roller Of Dryer A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Trunnion Roller Of Dryer A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Trunnion Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Trunnion Roller Shall Be Transported To Site From Store / Work Shop . The Trunnion Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement And Alignment Of The Trunnion Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . If Required , The Thrust Roller Shall Be Re-Arranged . The Out Side Surface Area Of The Damaged Trunnion Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Thrust Roller Of Dryer A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Thrust Roller Of Dryer A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Thrust Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Thrust Roller Shall Be Transported To Site From Store / Work Shop . The Thrust Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement / Alignment Of The Thrust Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . The Out Side Surface Area Of The Damaged Thrust Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Motor Of Product Cooler A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Motor Of Product Cooler A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Product Cooler Motor Shall Be Loosened / Removed And Lead / Transported To Electrical Work Shop . The New / Spare Motor Shall Be Transported To Site . The Motor Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Product Cooler Motor . , Replacement Of Gear Box Of Product Cooler A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Gear Box Of Product Cooler A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Gear Box Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Gear Box Shall Be Transported To Site . The Gear Box Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Gear Box . The Out Side Surface Area Of The Damaged Gear Box Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Motor Of Granulator A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Motor Of Granulator A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Granulator Motor Shall Be Loosened / Removed And Lead / Transported To Electrical Work Shop . The New / Spare Motor Shall Be Transported To Site . The Motor Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Product Cooler Motor . , Replacement Of Trunnion Roller Of Granulator A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Trunnion Roller Of Granulator A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Trunnion Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Trunnion Roller Shall Be Transported To Site From Store / Work Shop . The Trunnion Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement And Alignment Of The Trunnion Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . If Required , The Thrust Roller Shall Be Re-Arranged . The Out Side Surface Area Of The Damaged Trunnion Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Trunnion Roller Of Product Cooler A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Trunnion Roller Of Product Cooler A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Trunnion Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Trunnion Roller Shall Be Transported To Site From Store / Work Shop . The Trunnion Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement And Alignment Of The Trunnion Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . If Required , The Thrust Roller Shall Be Re-Arranged . The Out Side Surface Area Of The Damaged Trunnion Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Thrust Roller Of Granulator / Cooler A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Thrust Roller Of Granulator / Cooler A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Thrust Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Thrust Roller Shall Be Transported To Site From Store / Work Shop . The Thrust Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement / Alignment Of The Thrust Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . The Out Side Surface Area Of The Damaged Thrust Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Motor Of Vibrator Screen , A Or B Stream In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Motor Of Vibrator Screen A Or B Stream In Np Plant . The Tools And Tac. Last date of submission for this tender is 2020-06-29. This is a Rubber And Plastic Processing Machinery tender in Ambalamedu, Kerala

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

No Documents Found

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in