Fertilisers And Chemicals Travancore Limited
- AOC value
- ₹6.2L
- AOC date
- 12 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 12 Aug 20AOC date
- -Published
- -Closes
- -Bid opens
- 12 Aug 2020AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 12/08/2020
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Fertilisers And Chemicals Travancore Limited has published Replacement Of Damaged Conveyor Belt In Np Plant And Offsite Area , Fact Cd . , Replacement Of Damaged Conveyor Belt In Np Plant And Offsite Area , Fact Cd . , Replacement Of Conveyor Belt Of Width 750 Mm In Np / Os Area . [More Than 25 Meters] Work Involves: The New Conveyor Belt From Cd - Store / Old Usable Belt From Site Shall Be Transported And Unloaded At Required Site . Damaged Old Belt Shall Be Removed After Arresting The Gravity Take Up . The New Belt Shall Be Pulled In , Full Length Or Part [ More Than 25 Meters] And Placed Properly To Suit With Site Condition . The Arrangements Like Idler / Frame Dismantling , Wooden Planks Fixing , Belt Supporting Etc . Shall Be Done For Splicing / Mechanical Jointing Of Conveyor Belt . Splicing / Jointing Of Conveyor Belt Is Not In The Scope Of Contractor . The Conveyor Belt Shall Be Released After The Curing Of Joint / Getting Clearance . Removed Idlers / Frames Shall Be Fixed Back Properly . Trail Run Of The Conveyor Belt Shall Be Taken On Load , With Out Any Sway . Balance Belt Roll Shall Be Transported To Storage Area Near Offsite . Scrap Conveyor Belts Shall Be Transported To Scrap Yard After Cutting And Rolling The Same Into Smaller Bundles As Per Instructions . , Arrangements For Repair / New Splice Joint Of Conveyor Belt 750 Mm Width In Np / Os Area . [Up To 25 Meters] Work Involves: The New Conveyor Belt From Cd - Store / Old Usable Belt From Site Shall Be Transported And Unloaded At Required Site . Damaged Old Belt Shall Be Removed After Arresting The Gravity Take Up . The New Belt Shall Be Pulled In , Full Length Or Part [ Up To 25 Meters] And Placed Properly To Suit With Site Condition . The Arrangements Like Idler / Frame Dismantling , Wooden Planks Fixing , Belt Supporting Etc . Shall Be Done For Splicing / Mechanical Jointing Of Conveyor Belt . Splicing / Jointing Of Conveyor Belt Is Not In The Scope Of Contractor . The Conveyor Belt Shall Be Released After The Curing Of Joint / Getting Clearance . Removed Idlers / Frames Shall Be Fixed Back Properly . Trail Run Of The Conveyor Belt Shall Be Taken On Load , With Out Any Sway . Scrap Conveyor Belts Shall Be Transported To Scrap Yard After Cutting And Rolling The Same Into Smaller Bundles As Per Instructions . , Replacement Of Damaged Skirt Of Product Conveyors . Work Involves: Damaged Skirt Of Product Conveyors Chute At Two Sides Shall Be Removed And Replaced With New One . Maximum Length Of Skit Shall Be 15 Mtrs . Scrap Conveyor Belts Shall Be Transported To Scrap Yard . [ One Set Means Two Skirts Of One Chute . ]. Last date of submission for this tender is 2020-07-09. This is a Miscellaneous Fasteners tender in Ambalamedu, Kerala
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free