Fertilisers And Chemicals Travancore Limited
- AOC value
- ₹3.48L
- AOC date
- 30 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 30 Dec 19AOC date
- -Published
- -Closes
- -Bid opens
- 30 Dec 2019AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 30/12/2019
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Fertilisers And Chemicals Travancore Limited has published Pre-Fabrication And Erection Of Sludge Pumping Line With Modified Line Size From Etp To Settling Pit In Pap , Fact Cd . , Pre-Fabrication And Erection Of Sludge Pumping Line With Modified Line Size From Etp To Settling Pit In Pap , Fact Cd . , Fabrication And Erection Of 100 Nb Ss 304 Sludge Line From Etp To Pap: Collection / Transportation Of Required Materials From Stores . Make Necessary Site Arrangements For The Work . Fabricate And Erect 100 Nb Ss 304 Pipe From Etp To Setting Pit In Pap As Per Relevant Drawing . Pipeline Route Shall Follow The Existing 80 Nb Line Route . Fabricated Pipelines Shall Be Erected On Existing Pipe Racks Itself . All Pipe Welding Joints Shall Be Full Welded And Dp Test . Any Modification In The Pipeline Route Shall Be Incorporated With Approval From Competent Authority . Flange Joints With Stub Ends If Required Shall Be Provided As Per Site Instructions . Valves Shall Be Provided As Per Instructions From Engineer In Charge . Fabrication Of Stub End Shall Be Contractors Scope . After Complete Fabrication And Erection The Pipeline Shall Be Pressure Tested . All Arrangements / Piping For Pressure Testings Shall Be Done By The Contractor . Any Additional Requirement / Rerouting Of Existing Lines Shall Be Done Depending On Site Conditions . After Complete Fabrication And Erection Site Shall Be Cleared Off Scrap . Unused Pipes Shall Be Stacked In Earmarked Area . . , Dismantling And Removal Of Pipelines / Structurals :- The Existing Cs Sludge Line / Any Associated Structural Supports Shall Be Cut And Removed From All Heights And Elevations As Per The Instructions From Engineer In Charge To Facility Erection Of New Sludge Line . Dismantled Pipes Shall Be Transported To Scrap Yard , After Taking The Weight And Deposited In The Appropriate Areas Ear Marked . Usable Materials Shall Be Transported To Specific Locations And Neatly Stacked As Per Instruction . , Fabrication And Erection Of Pipeline Supports :- Collection Of Required Materials From Fact -Cd Stores / Plant Area And Transport To The Work Site At Pap / Etp . New Structural Supports Shall Be Fabricated And Erected On To Existing Pipe Rack To Facilitate Erection Of New Sludge Line . Any Modification / Strengthing Works On The Existing Structurals Shall Be Done As Per Site Conditions . . Last date of submission for this tender is 2019-12-11. This is a Valve tender in Ambalamedu, Kerala
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
No Documents Found
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free