Directorate Of Urban Affairs
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Directorate Of Urban Affairs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Directorate Of Urban Affairs has published Tender for Annual Plan - 2025-26 - Project No. 1876/26- Supply And Installation Of Ups At Dialysis Centre, Attadappa Under Buy Back Scheme. , Supply, Installation, Testing And Commissioning Of 20.0Kva/240 Volt True On-Line Igbt Ups ( 3Phase-1Phase ) With Built-In Isolation Transformer Model With Following Configuration. Input : (I) Input Voltage : 360-480 V (Ii) Freequency : 50 Hz+/- 5% (Iii) Input Power Factor : 0.9. Output : (I) Voltage : 220/230V +/- 1%. (Ii) Regulation +/- 1%. (Iii) Frequency : 50 Hz (Iv) Frequency Regulation : +/- 0.05 Hz (V) Power Factor : 0.8 To Unity (Vi) Transient Response : 8%(10%~90%(Linear Load)) (Vii) Voltage Harmonic : 3% (Linear Load) (Viii)Over Load Capacity (%) : 100 To 110% : 5Minutes , 110 To 120% : 2Minutes (Ix) Crest Factor : 3:1. Battery : 20 Nos. 12 Volt/ 100 Ah Tubular Battery, C10 Series (Preferred Make : Exide/Amaron) Including Rack , Connectors & Accessories. Display : Led Indications : Ups On# Battery Low/High# Out Put Voltage Low/High-R,Y,B# Over Load - R/Y/B# Fault# Charger On# Input Voltage Low/High - R,Y,B. Lcd Indications: Input Voltage & Frequency - R, Y, B# Output Voltage & Frequency- R, Y, B# Battery Voltage# Load Level# Working Status# Fault Status. Warranty 2 Year On-Site Warranty For Ups And 3 Year Replacement Warranty For Battery, Including Buy Back Price Of Old 20.0 Kva Ups With With 20 Nos. 12V/100 Ah Tubular Battery , Supply, Installation, Testing And Commissioning Of 10.0Kva/192 Volt True On-Line Igbt Ups ( 3Phase-1Phase ) With Built-In Isolation Transformer Model With Following Configuration. Input : (I) Input Voltage : 360-480 V (Ii) Freequency : 50 Hz+/- 5% (Iii) Input Power Factor : 0.9. Output : (I) Voltage : 220/230V +/- 1%. (Ii) Regulation +/- 1%. (Iii) Frequency : 50 Hz (Iv) Frequency Regulation : +/- 0.05 Hz (V) Power Factor : 0.8 To Unity (Vi) Transient Response : 8%(10%~90%(Linear Load)) (Vii) Voltage Harmonic : 3% (Linear Load) (Viii)Over Load Capacity (%) : 100 To 110% : 5Minutes , 110 To 120% : 2Minutes (Ix) Crest Factor : 3:1. Battery : 16 Nos. 12 Volt/ 100 Ah Tubular Battery, C10 Series (Preferred Make : Exide/Amaron) Including Rack , Connectors & Accessories. Display : Led Indications : Ups On# Battery Low/High# Out Put Voltage Low/High-R,Y,B# Over Load - R/Y/B# Fault# Charger On# Input Voltage Low/High - R,Y,B. Lcd Indications: Input Voltage & Frequency - R, Y, B# Output Voltage & Frequency- R, Y, B# Battery Voltage# Load Level# Working Status# Fault Status. Warranty 2 Year On-Site Warranty For Ups And 3 Year Replacement Warranty For Battery , Including Buy Back Price Of Old 10.0Kva Ups With With 20 Nos. 12V/100 Ah Tubular Battery. Last date of submission for this tender is 2026-06-16. This is a Ups tender in Attadappa, Kannur, Kerala
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free