Cochin Shipyard Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Cochin Shipyard Limited
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Cochin Shipyard Limited has published Supply Of Gate Valves As Per Attached Tender Document , Supply Of Gate Valves As Per Following Specifications , 0.5 Gate Valve Astm A-126 Working Parts Astm B62 Dimensions Ansi Pressure Class 125 0.5 Gate Valve 125# Astm A-126 Working Parts Astm B62 Dimensions Ansi Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 0.5 Gate Valve (Scrd Brz) Ub-Astm B-62 Ansi B16.5 Pressure Class 125 0.5 Gate Valve (Scrd Brz) Ub-Astm B-62 Ansi B16.5 125# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 0.75 Gate Valve Scrd Brz Ub Astm B-62 Ansi 16.15Pressure Class 125 0.75 Gate Valve Scrd Brz Ub Astm B-62 Ansi 16.15 125# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 1 Gate Valve (Scrd Brz) Ub-Astm B-62 Ansi B16.15Pressure Class 150 1 Gate Valve (Scrd Brz) Ub-Astm B-62 Ansi B16.15 150# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 1 Gate Valve Astm A-Ansi 126 Grade 16.9 Pressureclass 125 1 Gate Valve Astm A-Ansi 126 Grade 16.9 Working Parts Astm B62 Dimensions Ansi 125# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 2 Gate Valve (Flgd) Jis 10K Body & Trim Material: Bronze As Per Astm B62/Bc6 2 Gate Valve (Flgd) Jis 10K Body & Trim Material: Bronze As Per Astm B62/Bc6 Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 2 Gate Valve Body Mml Astm A-126 Working Parts Astm B62 Dimensions Ansi Pressure Class 125 2 Gate Valve Body Mml Astm A-126 Working Parts Astm B62 Dimensions Ansi 125# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 2 Gate Valve (Scrd Brz) Ub-Astm B-62 Ansi B16.15Pressure Class 125 2 Gate Valve (Scrd Brz) Ub-Astm B-62 Ansi B16.15 125# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 2 Gate Valve Os & Y Rs Flg Astm A-126 Pressure Class 125 2 Gate Valve Os & Y Rs Flg Astm A-126 125# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 2.5 Gate Valve C.S. To Astm A216 With Working Parts Bronze To Astm B62 Pressure Class 150 2.5 Gate Valve C.S. To Astm A216 With Working Parts Bronze To Astm B62 150# Api 600 Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 3 Gate Valve (Flgd) Jis 10K Body & Trim Material: Bronze As Per Astm B62/Bc6 3 Gate Valve (Flgd) Jis 10K Body & Trim Material: Bronze As Per Astm B62/Bc6 Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 3 Gate Valve Body Mml Astm A-126 Working Parts Astm B62 Dimensions Ansi Pressure Class 125 3 Gate Valve Body Mml Astm A-126 Working Parts Astm B62 Dimensions Ansi 125# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 3 Gate Valve Astm A-536R-B Pressure Class 125 3 Gate Valve Astm A-536R-B 125# With Bronze Astm B Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 3 Gate Valve Ibbm 0S & Y, Rs Flg, Astm Ansi A-126, B16.15 Pressure Class 125 3 Gate Valve Ibbm 0S & Y, Rs Flg, Astm A-126, Astm B-62, Ansi B16.15 125# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 4 Gate Valve (Flgd) Jis 10K Body & Trim Material: Bronze As Per Astm B62/Bc6 4 Gate Valve (Flgd) Jis 10K Body & Trim Material:Bronze As Per Astm B62/Bc6 Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 4 Gate Valve Astm A-216 Gr Wcb Ansi Pressure Class 150 4 Gate Valve Astm A-216 Gr Wcb Ansi 150# Astm B62 Api 600 Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 4 Gate Valve C.S. To Astm A216 With Working Parts Bronze To Astm B62 Pressure Class 150 4 Gate Valve C.S. To Astm A216 With Working Parts Bronze To Astm B62 150# Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 4 Gate Valve Wcb Cast Steel Body Pressure Class 150 4 Gate Valve Wcb Cast Steel Body 150# With Working Parts Bronze To Astm B62 Api 600 Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 6 Gate Valve Wcb Cast Steel Body Pressure Class 150 6 Gate Valve Wcb Cast Steel Body 150# With Working Parts Bronze To Astm B62 Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 10 Gate Valve Ibbm Os & Y Rs Flg Astm A-126 Ansib 16.5 Pressure Class 125 10 Gate Valve Ibbm Os & Y Rs Flg Astm A-126 Ansi B 16.5 125# Astm B62 Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order. , 12 Gate Valve Ibbm Os & Y Rs Flg Astm A-126 Ansib 16.5 Pressure Class 125 12 Gate Valve Ibbm Os & Y Rs Flg Astm A-126 Ansi B 16.5 125# Astm B62 Drawing & Dimension Details Should Be Providing With Quotation. Pressure Test & Manufacturing Certificate To Be Submitted Along With Material. Delivery Within 7 Weeks Items Should Be Conforming To The Modu 1989 Vendor Should Update The Status Of Material On Every 4 Weeks After Placement Of Order.. Last date of submission for this tender is 2025-09-30. This is a Gate Valves tender in Cochin, Kerala
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
2 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free